# Jackson Mann site planning: separate community-center, housing and school assumptions

At the Jackson Mann site, the community center, housing and possible school are planning variables with different evidence needs. Build separate concept scenarios instead of combining them into one implied contract. Keep the assumed program visible until the owner adopts a scenario.

## The Jackson Mann study has not settled one program

The Jackson Mann site at 500 Cambridge Street is in study and planning. The city describes an October 2026 proposal and feasibility work across public assets and housing. This is not evidence of an open construction opportunity. Source: [Allston-Brighton Community Center](https://www.boston.gov/departments/public-facilities/project/bcyf-allston-brighton-community-center) [Education adopted profiles](https://www.boston.gov/sites/default/files/file/2026/10/Education_2.pdf).

## Keep the center, housing and possible school as separate variables

This register separates the dated public record from the evidence needed to assign and price the work. Proposed questions do not establish contract scope.

| Interface | What the record establishes | What the estimate needs |
| --- | --- | --- |
| Community center | The city is testing center sizes in the shared-site study. | State the assumed program and source version; price alternative sizes separately. |
| Housing | The feasibility work tests a housing mix. | Keep unit mix and quantity as variables until an adopted scenario supplies them. |
| School | The study identifies a possible elementary school; the adopted education profile lists Allston Elementary design to be scheduled. | Treat school inclusion and scope as a decision fork, not a final site or procurement commitment. |
| Shared access and utilities | Programs share a site-planning context. | Model access, service and temporary-work interfaces as provisional allowances with a named source and decision owner. |

## Compare scenarios with one changed assumption

A useful concept register has two columns for each scenario: what the city record says and what the estimator assumed. For example, one option can include a possible school and another omit it; hold center and housing assumptions constant when isolating the difference. Neither option represents an adopted design.

## Request an adopted program before treating it as a package

Obtain the adopted program and site alternative, survey, utility information, access concept, delivery boundaries and latest owner decision. Record the author and version of each assumption and retire superseded scenarios.

When the owner selects a scenario, use [scope generation](https://piper-ai.com/resources/construction-scope-generation-guide) to turn its confirmed program and interfaces into package responsibilities. Keep superseded scenario assumptions in the [revision trail](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators), so a later estimate does not silently retain an abandoned option.