# John Trevino Jr. Metro Park Phase I: review site, utility and qualification boundaries

Before pricing Phase I, reconcile the site packages with the bidder’s own documented experience. Recheck the city listing and all addenda immediately before a submission; the published deadline may have changed or passed.

## The dated project record

The City listing for IFB 6100 CLMC1141 showed a November 19, 2026, 2 p.m. response deadline when checked November 17. Its $6.5 million figure is a solicitation estimate, not an award. The listed work includes meadow and invasive-species work, shelters, nature play, trails, an access road, parking, rain gardens, trees, utilities and a restroom. The source is [Official openIFB6100CLMC1141](https://financeonline.austintexas.gov/afo/account_services/solicitation/solicitation_details.cfm?sid=143005) [Owner clarification datedOct26,2026](https://assets.austintexas.gov/financeonline/downloads/vc_files/IFB_6100_CLMC1141/IFB_6100_CLMC1141_CLARIFY_1_v1.pdf). Check the current owner record before relying on any date or project status.

## Match physical park scope and bidder experience

The following is an estimating review, not a statement that the owner assigned these tasks to a particular contractor. Use the current drawings, specifications and contract documents to settle the actual boundaries.

| Scope or location | Review and assignment question |
| --- | --- |
| Site and landscape | Separate meadow preparation, invasive-species work, tree work and rain gardens; establish quantities and establishment obligations from the issued set. |
| Access and recreation | Trace access road, parking, trails, shelters and play areas to their transitions and restoration limits. |
| Utilities and restroom | Assign service connections, excavation, building work and commissioning boundaries from the plans. |
| Bidder experience | Match each comparable completed project to the bidding entity and the solicitation criteria; document evidence rather than relying on a parent’s resume. |

## Keep clarification separate from contract changes

The City’s October 26 clarification says comparable international projects may be considered, but the bidder must have completed them; parent-company experience is not accepted. It also says the clarification does not modify the contract and changes are made through addenda. Read the actual qualification language and addenda before reaching a bid decision.

Match comparable projects to the entity actually bidding, then review their size, scope and complexity against the solicitation's criteria. Keep the October 26 clarification with that evidence: it allows consideration of international examples but does not accept a parent's projects as the bidder's own work.

## Evidence needed for this package

Request the Phase I site and utility plans, landscape establishment requirements, restroom service interfaces and current qualification documents. Recheck the November 19 deadline and all amendments immediately before any submission or opportunity claim; this guide does not establish eligibility.

For the broader method, see the [logistics estimate review](https://piper-ai.com/resources/construction-logistics-plan-estimate-review). Use the project-specific register above to bring the general boundary review back to the actual work.