# Leavitt Street-34th Avenue Elevators: contractor scope and procurement guide

For a GC chief estimator considering Leavitt Street-34th Avenue Elevators, the next decision is whether to investigate the eventual package, not whether to price the plan as a complete scope. NYCHA's [2026 Q4 procurement plan](https://www.nyc.gov/assets/nycha/downloads/pdf/business/planned-procurement-opportunities.pdf#page=7), dated September 29, 2026, lists **Elevators** at **Leavitt Street-34th Avenue**, Queens, with primary work type **Elevators** and planned method **Sealed Bid**. This is independent Piper analysis, not a NYCHA notice or affiliation. Research date: November 15, 2026.

NYCHA's [development data](https://data.cityofnewyork.us/resource/evjd-dqpz.json), as of January 1, 2025, records 1 residential building at Leavitt Street-34th Avenue and lists Leavitt St, Union St, 34th Ave and 34th Rd as location streets. This is development context, not a count of buildings or locations included in the planned work.

## What NYCHA recorded for Leavitt Street-34th Avenue

The elevator entry is a distinct planned package at Leavitt Street-34th Avenue. The same page separately names a heating, plumbing, ventilation, flood mitigation and kitchen-and-bath renovation entry at that development; it does not establish how the two packages interface.

The Q4 entry is a planning snapshot. It does not establish an open solicitation, solicitation number, deadline, award, contractor, duration or start of construction. Check the current agency solicitation and all applicable addenda before committing estimating resources or making a bid decision. An addendum may change the issued instructions; verify the controlling version instead of relying on the plan.

The planned method is recorded as Sealed Bid. Confirm the actual solicitation and its instructions before treating this as a bid opportunity; the planning label does not establish eligibility or submission requirements.

## Questions to define the Leavitt Street-34th Avenue work

The questions below are estimating prompts, not confirmed project requirements. Ask for the issued drawings, specifications, scope narratives, exhibits and revisions when available, then assign each answer to a trade package and an estimate line.

- Which elevator units and components are included and what work is specified?
- Does the issued package identify any interface with the separately listed renovation work?
- What related electrical, building and testing work belongs in the elevator scope?

Log each unresolved work limit with its source, package owner and estimate treatment. Reconcile trade exclusions against the issued documents before carrying a number.

## Decide whether to advance the review

First establish the current solicitation identifier, response date, procurement route and document baseline from NYCHA's current materials. Then check scope coverage and submission requirements separately. Use the [NYC public construction bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to connect the issued requirements to package owners and the number. Review the [NYC prevailing wage and PLA estimate guide](https://piper-ai.com/resources/nyc-prevailing-wage-pla-estimate-review) against the actual contract; neither applicability nor rates are established by this plan.

The [construction scope generation guide](https://piper-ai.com/resources/construction-scope-generation-guide) offers a way to organize the documents once obtained. The NYC public project guides provide other recorded project entries. For a separate comparison, see Conlon Lihfe Tower Elevators; its requirements cannot be transferred to this package. Keep any bid/no-bid recommendation conditional until the controlling documents and material scope gaps are resolved.