# LN25WTSNB - Design Build for Westchester Square Library: project scope and procurement guide

DDC’s LN25WTSNB design-build procurement describes a new 10,000 to 12,000 square foot New York Public Library branch in the Westchester Square neighborhood of the East Bronx. The September 8, 2025 City Record notice calls for adult, teen and children’s areas supporting reading, study, computing, storytelling and community use. [City Record: Westchester Square Library design-build](https://a856-cityrecord.nyc.gov/RequestDetail/20250902007)

This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.

## Westchester Square procurement and site

The notice was archived when checked November 15, 2026 and listed a November 17, 2025 due date. It does not identify an exact new site address. Treat the neighborhood and program as the established public description, not proof of a particular parcel, award, design or construction start.

Sources for this project: [City Record: Westchester Square Library design-build](https://a856-cityrecord.nyc.gov/RequestDetail/20250902007).

## Site, utilities and library program

The site is the first estimating gate. Obtain the approved parcel, survey, geotechnical information, utility availability, access rights and any demolition or remediation documents before converting the space program into a site cost. An assumed parcel could change foundations, deliveries and connections materially; keep those costs conditional until the project documents identify the site.

## Design-build brief and branch transition

Next, test the design-build brief against the library program: assign space planning, accessibility, building systems, technology infrastructure and commissioning to the responsible design and construction packages. Ask how the existing branch transitions and whether interim service is required, without assuming either is part of the contract. The nominal RFQ downloads were unreadable in this research; request the actual issued package and amendments.

## Reconcile the project documents before pricing

Use the [DDC addenda and scope review](https://piper-ai.com/resources/nyc-ddc-addenda-scope-estimate-review) to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist). The NYC public project directory helps distinguish this package from other agency projects.