# Logan E2 L1761: keep geothermal testing separate from production scope

L1761-C1 is an investigation carry: the advertised work is a geothermal test bore intended to determine expected ground-source heat-exchanger capacity, plus associated soil disposal and water treatment. Do not turn that notice into a production geothermal installation quantity. The useful estimating record connects the test deliverable to the assumptions and handling work that support it.

## Establish the historical package boundary

The [Massport L1761-C1 notice](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-130665&external=true&parentUrl=bid) advertised the E2 Lot Geothermal Test Bore with a July 15, 2026 general-bid deadline. The [public listing](https://www.bidexpress.com/businesses/27137/home) identifies the same package and date. The notice gives a $250,000 estimated project cost, a historical owner estimate rather than a bid or a price for a production system.

The notice states the purpose of the test but does not report a tested capacity, acceptance threshold, bore depth or count, fluid chemistry, waste classification or production-loop quantity. It does not establish that an airport-wide geothermal conversion was awarded.

## Test and handling evidence checklist

Use the following as an estimator's review record. It does not prescribe a test standard or disposal method.

| Record | Question to resolve from issued documents | Pricing consequence to investigate |
| --- | --- | --- |
| Test scope | What locations, bore details, procedures and deliverables are specified? | Define the investigation quantity and proposal inclusions |
| Capacity basis | What result and assumptions must the report communicate? | Identify report and analysis responsibilities without inventing a capacity |
| Soil | What disposal basis, quantities and documentation are specified? | Separate handling and disposition assumptions from drilling |
| Water | What treatment basis and deliverables are specified? | Compare proposal inclusions and stated exclusions |
| Future system | Is any production design or installation in this issued package? | Keep a later system out of the test carry unless documents include it |

Record the source and revision for every answer and flag each unresolved item. A bidder's exclusion for treatment, for example, needs a separate review against the issued specification before the proposal is comparable. If a later design uses the test results, retain the report and its assumptions as evidence rather than treating an expected capacity as a measured result.

## Get the issue set before finalizing the carry

Request the test specification, site information and applicable handling requirements; the short notice does not establish their details. The Boston project-source guide helps locate the package, while [addenda tracking](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) preserves changes to the testing or handling basis.