# Logan L1820: separate new Terminal E garage from DP6 existing-garage work

The L1820 estimating boundary runs across more than one location. The historical DP6 notice places wayfinding and painting renovations in the existing Central and West garages, while describing a proposed Terminal E garage and pedestrian connections. Do not put all DP6 work into a new-garage paint row.

## Read the location and package together

The [L1820-C2 DP6 painting trade RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-121211&external=true&parentUrl=bid) described a proposed approximately 725,000-square-foot, nine-level precast Terminal E parking garage, a Level 4 walkway connection and pedestrian bridges connecting Terminal E to the garage complex. In the same notice, DP6 provides wayfinding and painting renovations in the existing Central and West garages. These are historical advertised descriptions, not verification of the current design or completion.

An [earlier Terminal E garage trade RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-118058&external=true&parentUrl=bid) describes the proposed new garage, while an [earlier North Garage RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-111607&external=true&parentUrl=bid) uses the same L1820-C2 identifier. Cross-reference the earlier North Garage label under L1820-C2; that shared identifier alone establishes neither another new site nor identical physical package limits. The [index](https://www.bidexpress.com/businesses/27137/home) also lists a 2026 L1820 trade RFQ, but its title alone does not establish later scope or status.

## Make a location-by-package register

| Location or connection | Historical notice basis | Estimator action |
| --- | --- | --- |
| Proposed Terminal E garage | Nine-level precast garage in the broader description | Identify current drawings, package limits and trade inclusions |
| Level 4 walkway and bridges | Pedestrian connections described in the proposed project | Mark endpoints and interfaces; obtain access and outage assumptions |
| Existing Central and West garages | DP6 wayfinding and painting renovations | Locate each renovation and compare its proposal scope separately |
| North Garage name | Earlier L1820-C2 trade RFQ label | Cross-reference ID and notice date; confirm identity in issued documents |

This register is an estimator's review tool. Add the plan reference, revision, responsible package and unresolved interface to each row. At a pedestrian connection, identify where the new work ends and the existing facility work begins before comparing proposals. Do not sum historical trade RFQ estimates as a current project budget.

## Resolve the other Central and West garage interface

The later [L1973 RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-134058&external=true&parentUrl=bid) also describes work in Central and West garages. The notices do not establish that L1973 superseded DP6 or resolve overlap. The [L1973 interface review](https://piper-ai.com/resources/logan-l1973-garage-repair-signage-elevator-sequence) follows its rehabilitation, signage and elevator questions separately. Obtain the controlling package boundaries, status and access constraints before excluding or duplicating a carry. Verify the issued scope and [track revisions](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) for each location.