# Logan L1973: connect garage rehabilitation, signage and eight elevators

The L1973 preconstruction decision is how to relate garage rehabilitation, wayfinding and elevator modernization at each affected location. An estimate organized only by trade can obscure the same circulation core appearing in all three scopes. Create a location-based interface record first, then price the issued scope and its documented sequence.

## Three scopes, one circulation problem

Massport's [L1973 CMAR qualification notice](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-134058&external=true&parentUrl=bid) described rehabilitation of drainage, structural elements, stairs, lights and signs in Central and West garages; signage upgrades in and around Central Parking; and modernization of eight elevators in and around Central Garage circulation cores. The notice identifies the elevators as important to the traveling public and calls for careful sequencing to minimize disruption.

The CMAR RFQ set a November 5, 2026 qualification deadline and sought a shortlist for a later RFP. It does not establish a CM award or a negotiated GMP. An [earlier consultant RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-128652&external=true&parentUrl=bid) concerned planning, design and construction-related services; its consultant fee cap is not a construction budget.

## Record the three interfaces by location

| Location record | Rehabilitation question | Signage question | Elevator question |
| --- | --- | --- | --- |
| Garage level or core | Which structural or drainage work is shown and on what revision? | Which signs and supports fall in the same area? | Which of the eight cars or approaches is affected? |
| Proposed work period | What area and access assumptions underpin the carry? | Is interim or final wayfinding included in a proposal? | What availability assumption is priced and who must confirm it? |
| Open interface | Which proposal includes protection and restoration? | Who carries sign removal and reinstatement if applicable? | What other work must be coordinated with the car's availability? |

This is an estimator's planning tool, not Massport's sequence. For each row, attach the drawing, trade proposal and revision, then mark the decision as open until supported. Ask for the actual availability criteria, passenger routes and closure constraints before pricing a sequence. The notice does not establish how many elevators must remain in service, parking closures or repair quantities.

## Distinguish the neighboring garage package

The earlier [L1820-C2 DP6 painting RFQ](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-19-1411-CAPPR-LOC1-121211&external=true&parentUrl=bid) described wayfinding and painting in existing Central and West garages. Its location warrants an interface check, but neither notice resolves overlap or establishes acceptance or exclusion from L1973. The L1820 location-by-package review separates that existing-garage work from the proposed new Terminal E garage. Obtain controlling boundaries and status before adding or removing that work. Use the Boston bid-source guide and [addenda review workflow](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) to retain the source of each decision.