---
title: 'LQCA19WSD - Woodside Library Branch Major Renovation: project scope and procurement guide'
url: 'https://piper-ai.com/resources/lqca19wsd-woodside-library-branch-major-renovation-project-guide'
description: 'Woodside Library renovation: review the archived CM-Build notice, entrance and accessibility work, building systems, historic fabric and site access questions.'
contentTypes: [guide]
publishedAt: '2026-11-19T22:57:56.513Z'
updatedAt: '2026-11-19T22:57:56.524Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# LQCA19WSD - Woodside Library Branch Major Renovation: project scope and procurement guide

DDC’s LQCA19WSD is a CM-Build major renovation of Woodside Library, 54-22 Skillman Avenue, Queens. The May 20, 2026 City Record describes building-system, circulation and accessibility improvements, including the main entrance, along with hazardous-material abatement, adjacent access agreements and evaluation and potential restoration of historic elements. [City Record: Woodside Library major renovation RFQ](https://a856-cityrecord.nyc.gov/RequestDetail/20260514018)

This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.

## Woodside procurement and preservation scope

The notice was archived when checked November 15, 2026, after its June 12 listed due date. DDC’s March pilot update anticipated an RFQ and is historical context, not evidence of an award or construction start. The public description does not settle the final preservation decisions or scope.

Sources for this project: [City Record: Woodside Library major renovation RFQ](https://a856-cityrecord.nyc.gov/RequestDetail/20260514018); [DDC CM-Build pilot update](https://www.nyc.gov/site/ddc/about/press-releases/2026/pr-032526-CMBuild.page); [Queens Public Library: participatory budget](https://connect.queenslibrary.org/1679).

## Entrance, abatement and property access

Use an interface register for the main entrance: survey and accessibility design, demolition and abatement, adjacent-property access, new work and restoration. For each activity ask whether access agreements are already in place, what period they cover and which party bears the associated work. A route shown conceptually across an adjacent property is not the same as an executed right of access.

## Building systems and library operations

For systems routes through older fabric, request the survey, hazardous-material report and preservation decisions together. Carry only the work supported by issued documents and identify unresolved treatment or access as a qualification. Ask whether library operations and collections remain during construction. The RFQ downloads were unreadable in this research, so no drawings or technical specifications are claimed as reviewed.

## Reconcile the project documents before pricing

Use the [DDC addenda and scope review](https://piper-ai.com/resources/nyc-ddc-addenda-scope-estimate-review) to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist). The NYC public project directory helps distinguish this package from other agency projects.

Compare the library guides when separating building-system upgrades from a broader renovation; the project name alone does not establish trade limits. See the Macon Library systems upgrade guide.
