# Manhattan preconstruction guides: find the next review by decision

A Manhattan preconstruction lead usually needs to settle a specific next decision, not read every guide. Start with the question that could change the bid basis: which record applies, which approval remains open, where two packages meet, or what a documented project can teach the team. Follow the route below and carry the source date and unresolved question into the estimate.

| If the next question is | Start with | Expected output |
| --- | --- | --- |
| What is the building and approval basis? | Property status and approval path | Record identifiers, applicable review route and open status |
| What changes the fabric or a trade package? | Protected fabric or street and utility interfaces | Issued detail, scope owner and priced assumption |
| Does transit or an easement affect this site? | Transit adjacency and developer obligations | Written disposition or site-specific obligation |
| How did a public owner describe a similar boundary? | Waterfront, housing or institutional cases | A dated case to test against your own package |
| What should we ask at a meeting? | Event or archive | A targeted question and source to check before attending |

This Piper-authored route map is editorial navigation, not a legal checklist or a list of open bids. Private property and alteration questions depend on the actual site and responsible professionals; public-owner cases need the applicable owner documents and procurement boundaries. A named project is not proof of a live solicitation. For MTA work, the [contracting page](https://www.mta.info/agency/construction-and-development/contracting) distinguishes current and upcoming opportunities from awards and bid results.

## Confirm property status and approval path

Start by matching the actual property, filing and work to a review route. [DOB building data](https://home4.nyc.gov/site/buildings/dob/find-building-data.page) separates historical BIS records and DOB NOW transactions; an index result is not the approved design. [LPC permit types](https://www.nyc.gov/site/lpc/applications/permit-types.page) distinguish review and post-approval routes.

## Price protected-building fabric

Use these guides when protected material, an opening or an attachment can change the trade scope. Establish the approved detail and conditions before releasing fabrication.

## Resolve street access, utility service and temporary equipment

A route map or property search does not authorize street work. [NYC DOT](https://www.nyc.gov/html/dot/html/infrastructure/permits.shtml) describes distinct roadway and sidewalk permits; [DEP](https://www.nyc.gov/site/dep/about/dewatering-pretreatment-scavenger.page) identifies separate groundwater discharge processes. Match them to the actual proposed work.

## Separate transit adjacency from developer obligations

A third-party project near transit and a direct MTA construction package are different questions. The [MTA External Partner Program](https://epp.mta.info/) describes its application and review process; use the written project disposition and applicable documents to establish the actual obligations.

## Use waterfront, park and civil cases

These public records are cases for testing interfaces, not a procurement feed. Open each guide for its source date and the limits of its documented scope.

- [The Battery wharf rebuild](https://piper-ai.com/resources/battery-coastal-resilience-wharf-ferry-phasing): Coordinate elevated wharf work with ferry operation and the documented phase boundary.
- [Academy Street and North Cove parks](https://piper-ai.com/resources/academy-street-north-cove-parks-site-interfaces): Keep the two Inwood park sites and their shoreline connections separate.

## Compare occupied-housing scope and phase boundaries

A building-level heat or envelope decision can depend on resident access and a separately released phase. Use the relevant case to frame the question, then obtain the actual project basis.

## Trace civic and institutional building interfaces

Choose the system or access boundary that resembles the current estimate. Each case has its own owner, record and dated scope.

### Site, transit and access

### Pool, performance and accessible spaces

- [Asser Levy Recreation Center](https://piper-ai.com/resources/asser-levy-hvac-pool-flood-mitigation-interfaces): Coordinate pool plant and HVAC service with the documented flood-mitigation boundaries.

### Envelope, building conversion and occupancy

- [70 Mulberry Street](https://piper-ai.com/resources/70-mulberry-reconstruction-facade-all-electric-interfaces): Protect retained historic fabric while coordinating the all-electric reconstruction.
- [Alfred E. Smith Recreation Center](https://piper-ai.com/resources/alfred-smith-windows-cooling-envelope-interface): Reconcile window replacement with cooling equipment and distinct agency project records.

### Plant, power and controls

- [111 Centre Street energy upgrade](https://piper-ai.com/resources/111-centre-street-energy-upgrade-controls-chiller): Trace chiller, fan and pump controls, sensors, BMS and lighting interfaces.
- [253 Broadway fire protection](https://piper-ai.com/resources/253-broadway-fire-alarm-core-branch-phasing): Distinguish the fire-alarm core phase from later branches and connected systems.

## Choose an event or archive for the question you need answered

Use past programs for subject context and current inquiry routes for a specific question. Check the organizer before planning attendance: the [BE-Ex calendar](https://be-exchange.org/events/) advertised a December 2 steam panel and a December 9 geothermal showcase, including an online option for the latter, as of November 17, 2026.

### Past programs and archives

- [BE-Ex Window Heat Pump Expo 2026](https://piper-ai.com/resources/be-ex-window-heat-pump-expo-2026-manhattan-quote-review): Make room-unit installation quotes comparable without assuming every building avoids upgrades.

### Current inquiry and upcoming preparation

- [BE-Ex steam-rate panel 2026](https://piper-ai.com/resources/be-ex-steam-rate-case-2026-manhattan-capital-option-questions): Prepare for the advertised steam panel by separating operating assumptions from capital work.
- [BE-Ex Geothermal Showcase 2026](https://piper-ai.com/resources/be-ex-geothermal-showcase-2026-manhattan-feasibility-allowance): Ask whether the geothermal allowance prices a study, enabling work or designed installation.

## Keep the next decision attached to the evidence

For the chosen route, record the property or package identifier, source and revision date, unresolved question, responsible reviewer and the estimate or schedule assumption at risk. Obtain the issued design and written owner or agency disposition where they govern. If a guide's source is old or the project has moved on, refresh the source before relying on its status. The directory helps choose the next review; it cannot settle the site-specific decision for the team.