# Massachusetts hoisting bids: match the equipment to credentials and employer evaluation

For a Massachusetts hoisting bid, match the proposed machine and assigned work to the operator's actual credential and the responsible employer's applicable evaluation. A license class alone is not a complete readiness decision.

The state's [hoisting machinery regulation, 230 CMR 6](https://www.mass.gov/doc/230-cmr-6-hoisting-machinery/download), distinguishes equipment permitted under license restrictions, including 1A, 1B and 1C. They are not interchangeable shorthand. The state's [application guidance](https://www.mass.gov/how-to/apply-for-a-hoisting-engineer-license) directs applicants to the relevant equipment restriction and describes two-year renewal. Ask the responsible employer and the Office of Public Safety and Inspections (OPSI) to determine applicability, exemptions and any temporary permit route for the actual machine.

## Hand off an equipment-specific readiness record

| Field | Bid review question | Owner to confirm |
| --- | --- | --- |
| Machine and task | What make, model, configuration and assigned work are proposed? | Equipment provider and employer |
| State credential | Which restriction applies and is the operator's status current? | Employer and OPSI as needed |
| Federal lane | Is this equipment covered by OSHA crane operator requirements? | Responsible employer and safety lead |
| Training and credential | What training, licensing or certification applies? | Employer |
| Evaluation | Has the employer evaluated the operator for the relevant equipment and work? | Employer and evaluator |
| Renewal and replacement | Who tracks expiry and substitutes if the machine or operator changes? | Staffing lead |

For equipment covered by [OSHA 1926.1427](https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.1427), the employer has separate duties concerning training, certification or licensing, and evaluation. Evaluation addresses the equipment and assigned work; the required record includes the operator's name, evaluator's name and signature, date, and equipment make, model and configuration. A state license or certificate alone does not establish that the separate evaluation has occurred. Equipment exceptions have their own applicable duties, so the employer must determine the lane.

## Carry the staffing assumption into buyout

Illustrative example: a bidder proposes one machine and operator, then substitutes a different configuration after award. Recheck the state restriction and the applicable employer evaluation before treating that person as ready. Ask bidders to identify who supplies the operator, credential evidence, evaluation and replacement coverage, and what their price assumes. This is a staffing and scope review, not an operating or lift plan. Connect it to [subcontractor bid review](https://piper-ai.com/resources/subcontractor-prequalification-vs-bid-review) and the [prebid safety scope](https://piper-ai.com/resources/construction-safety-scope-prebid-review).

Use the Massachusetts training-resource comparison to select a learning route separately from proving equipment-specific operating readiness.