# Mayor’s Walk: distinguish two-phase study from the selected design package

For a schematic estimate of Mayor's Walk, carry two phase options for comparison, but do not treat them as two awarded construction packages. The [October 27, 2026 owner presentation](https://www.boston.gov/sites/default/files/file/2026/10/BostonCommonProjects_Meeting1-Presentation_261027%20%281%29_0.pdf) assigns both phases schematic design and separate detailed estimates; only the selected phase advances to 60% construction documents. The selection changes which scope can be priced with greater confidence.

The assignment includes Charles Street Plaza, historic character, accessibility and circulation, site furnishings, and evaluation of restroom integration and vendor location. Evaluation is not acceptance of either amenity. The presentation identifies design and construction budgets as to be determined, and its 2027 milestones are forecasts rather than evidence of delivered documents.

## Phase and boundary register

Use a separate row for each phase and retain the same comparison categories. This is a proposed estimating tool, not the owner's selected scope.

| Decision | Record in each phase | Resolve before a committed carry |
| --- | --- | --- |
| Phase selection | Limits quantities and exclusions for each option | Which phase advances and what is its current drawing revision? |
| Restroom and vendor | Evaluation costs and possible enabling interfaces separately | Are either facilities included and where are their limits? |
| Existing utilities | Known inventory and unverified connections | What is retained abandoned relocated or replaced under the issued design? |
| Pavement and trees | Conceptual path impacts and root conflicts | What protection grades and reinstatement are designed? |
| Adjacent Parkman work | Shared edges access and possible irrigation interfaces | Which project carries each tie-in and temporary condition? |

The presentation's site analysis identifies pavement and root conflicts, slope and drainage considerations, garage limits and an inventory of existing electrical, stormwater and water infrastructure. Those observations identify questions, not confirmed utility capacities or an instruction to replace every system. Do not scale utility lengths from a schematic diagram. Request utility records and field verification, identify the proposed tie-in and price any unresolved investigation as a clearly labeled assumption.

## Separate the neighboring assignment

Parkman Bandstand is an adjacent project with a different design team and an assignment through full construction documents. Its access and event-infrastructure work should not be silently absorbed into the Mayor's Walk phase estimate. At each shared edge, note the physical limit, controlling drawing, intended sequence and party responsible for reinstatement. If either design changes, compare the boundary again rather than carrying both teams' assumptions.

The owner presentation calls for archaeological survey and further concept options. Retain an explicit risk or qualification for information that could alter the footprint, without inventing findings or a schedule approval. Before issuing a trade package, verify the issued project scope and [trace scope changes to the controlling revision](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). The presentation is a planning record, not a current construction bid set.