---
title: 'McKinney Playground: trace field drainage and splash-pad water handoffs'
url: 'https://piper-ai.com/resources/mckinney-playground-drainage-field-water-handoff'
description: 'Track field drainage, playground work and splash-pad water service as separate McKinney construction handoffs.'
contentTypes: [guide]
publishedAt: '2026-11-22T06:41:04.679Z'
updatedAt: '2026-11-22T06:41:04.693Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# McKinney Playground: trace field drainage and splash-pad water handoffs

At McKinney Playground, do not use “drainage complete” as a park-wide status. The owner's [September–October 2026 construction update](https://www.boston.gov/sites/default/files/file/2026/10/McKinney%20Construction%20Update%20Sept-Oct%202026.pdf) captions field rough grading and subsurface drainage as complete on October 7, while forecasting further playground drainage and splash-pad water-service coordination. A GC or CM should track these as separate location-and-system handoffs.

The update says the playground and courts closed September 14, 2026 and anticipates closure through summer 2027. It describes mobilization, clearing and underground work underway. The forecast is not a verified reopening date, and a progress caption is not proof of final acceptance.

## Location and system holdpoint record

The following register is a proposed coordination tool. The dates and status refer to the owner's update; the holdpoints are estimator and project-team questions, not reported inspection results.

| Location or system | Reported or forecast status | Holdpoint to resolve |
| --- | --- | --- |
| Athletic field | October 7 caption says rough grading and subsurface drainage complete | Obtain as-builts inspection records and acceptance before relying on status for follow-on work |
| Playground drainage | Further structures forecast for October–November | Confirm installed limits inspection and interfaces with equipment and surfacing |
| Splash pad | Utility coordination and water-service upgrades forecast | Identify service boundary responsible party approvals and test records |
| Paths | Binder paving forecast | Confirm drainage crossings subgrade release and protection of completed work |
| Ballfields | Infield clay forecast | Confirm grades material delivery and readiness of underlying work |
| Leicester Street stairs and trees | October 14 caption reports stair demolition and root protection underway | Confirm protection limits restoration detail and access for remaining work |

The update lists stone-pocket infiltration systems and drainage piping, as well as Boston Water and Sewer Commission drainage inspections, in its August–October work list. A listed inspection does not establish a pass. Request dated inspection and acceptance records, the installed limits and any outstanding corrective work. Do not infer infiltration capacity or compaction criteria from a progress summary.

## Sequence the water and surface interfaces

Before committing a path or splash-pad allowance, identify where the water service starts and stops, who coordinates the connection, and what work must be inspected before it is covered. Separately identify the playground drains, path crossings and final surface restoration. If the water-service responsibility or required testing is unresolved, retain a written qualification rather than assigning it by assumption.

Tree-root protection continues alongside construction. Check the current protection plan and access limits against the proposed sequence for stairs, drainage and paving. A 2024 schematic option is useful background, but does not establish the current issue-set details. The [project page](https://www.boston.gov/departments/parks-and-recreation/project/improvements-mckinney-playground) and dated update should be read with the actual contract records.

For a current handoff, verify the issued project scope, then [trace scope changes to the controlling revision](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). Record the document date, location, system, reported progress, evidence of acceptance and next responsible party. That distinction keeps a field progress milestone from closing unrelated work elsewhere in the park.
