# McLaughlin Playground: compare Fisher Avenue access options

The Fisher Avenue access decision at McLaughlin Playground affects more than a ramp line item. Grade, woodland disturbance, terrace circulation and the Pool Stairs interface have to be compared together. The [City project page](https://www.boston.gov/departments/parks-and-recreation/project/improvements-mclaughlin-playground) lists contractor and completion as undetermined. The [September 17, 2026 meeting notes](https://www.boston.gov/sites/default/files/file/2026/09/260917_McLaughlin%20Playground_CM2%20Meeting%20Notes.pdf) describe alternatives and community discussion, not a selected or approved design.

## Compare the prerequisites, not just the ramp

| Decision | Evidence in September notes | Open estimating question |
| --- | --- | --- |
| Fisher access | Three ramp approaches discussed; terrain and limiting woodland disturbance constrained fewer switchbacks | Obtain survey, route geometry, retaining and restoration details |
| Terrace circulation | Three broader concepts connect and organize terraces differently | Which concept and interface is selected? |
| Pool Stairs | Parks said renovation would include handrails | Obtain issued stair limits and tie-in details |
| Encroachments | Parks said abutter encroachments must be resolved before construction | Who secures resolution and when? |
| Accessibility review | Parks expected Fisher access likely to be necessary; final variance decision rests with MAAB | What determination and conditions actually apply? |

The broader concepts also differed in field orientation and activity locations. Community preferences about the woodland, dog park or field are not commitments. The meeting did not establish a variance or a final legal accessibility ruling.

## Carry comparable options to the decision

For each candidate, put the route and terrace connection on the same drawing revision, then list grading, temporary access, woodland restoration, stair interfaces and review dependencies. Mark dimensions and quantities unknown until the designer supplies a basis. An illustrative option that avoids one terrace connection may still require another route or a different retaining solution; compare the whole route, not an isolated ramp allowance.

Ask the owner for the selected scheme, survey, applicable accessibility determination and resolution of encroachments before converting a concept estimate into a firm scope. Track changed assumptions through the public project record and [addenda review](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators).