# Landmark flood barriers: include the permanent hardware in the approval scope

A removable flood panel can leave permanent channels, brackets or ground attachments on a landmark. For a Lower Manhattan bid, put those attachments and their substrate repair in the preservation scope and coordinate the flood strategy separately with the responsible design professionals.

## Separate the components and approvals

[LPC's April 2024 flood shields and barriers fact sheet](https://www.nyc.gov/assets/lpc/downloads/pdf/Flood_shields_and_barriers.pdf) distinguishes permanent barriers and permanently attached hardware from specified temporary emergency measures. Permanent hardware for a removable barrier requires LPC review. Confirm the actual proposal and any exception with the applicant. LPC preservation approval does not certify flood performance or establish that a strategy meets DOB requirements.

| Component | Record for review | Scope owner to identify |
| --- | --- | --- |
| Channels and brackets | Location, attachment and visible finish | Barrier installer and preservation designer |
| Ground attachments | Substrate and fixing detail | Civil or concrete trade and engineer |
| Removable panels | Dimensions, handling and fit | Barrier vendor |
| Historic fabric | Drilling, protection and repair details | Restoration trade |
| Storage and deployment | Storage location, access and responsible operator | Owner and operations team |
| Performance and code | Design criteria and applicable filing | Responsible engineer and filing professional |

## Illustrative bid handoff

A hypothetical removable shield spans a landmark entrance. The vendor quote includes panels but excludes wall channels and substrate repair. Ask for the attachment detail and identify who drills, seals and restores the historic material. Carry storage and deployment arrangements only as defined by the owner, with access and handling assumptions visible. The engineering team must establish the designed protection strategy and applicable code basis; the estimator should not infer performance from an LPC permit.

Connect the review to [NYC building code preconstruction](https://piper-ai.com/resources/nyc-building-code-preconstruction-review) and [scope generation](https://piper-ai.com/resources/construction-scope-generation-guide).