# Landmark rooftop equipment: price the visibility mockup before the final layout

For a landmark roof retrofit, equipment dimensions alone are not a released layout. Establish whether LPC can review the proposed installation on drawings or needs a full-scale visibility mockup, then price the temporary work and possible layout revision.

## Define the envelope before asking for review

[LPC's HVAC guide](https://www.nyc.gov/assets/lpc/downloads/pdf/LPCPermitGuidebook_Chapter12_HVAC.pdf) explains that rooftop equipment can require a full-scale visibility mockup and staff site visit. Include the complete proposed envelope, including railings, in the review. The guide also notes that a mockup may itself need permits. Confirm the requirement and applicable permits for the actual building and proposal; a mockup is not universal.

| Sequence | Deliverable | Estimate or release question |
| --- | --- | --- |
| Proposed layout | Equipment, supports and railing envelope | Is the reviewed position the same as the vendor's? |
| Review route | Applicant confirms drawing or mockup requirement | What temporary work and permits are needed? |
| Mockup if required | Full-scale installation and safe roof access | Who builds, maintains and removes it? |
| Staff review | Site visit and documented response | What layout revisions affect equipment and supports? |
| Final release | Approved location and coordinated drawings | Can the owner authorize procurement? |

## Illustrative retrofit decision

A GC receives a mechanical quote based on a preliminary roof arrangement. The estimator requests the complete equipment and railing envelope, prices access and a temporary mockup as a separate assumption if required, and identifies who coordinates the site visit. If the location changes after review, revisit supports, distribution and vendor lead time before accepting a final price. The schedule should show review and revision as gates rather than a guaranteed duration.

Connect this decision to [Local Law 97 retrofit scope](https://piper-ai.com/resources/nyc-local-law-97-retrofit-construction-scope) and record the open design response in the [prebid RFI review](https://piper-ai.com/resources/construction-rfi-prebid-scope-review).