---
title: 'NYC special inspection agency selection: verify the approved scope before carrying a quote'
url: 'https://piper-ai.com/resources/nyc-special-inspection-agency-selection'
description: 'Compare NYC special inspection proposals by approved inspection type, current registration, quote coverage and the Technical Report handoff.'
contentTypes: [guide]
publishedAt: '2026-11-23T05:41:31.996Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# NYC special inspection agency selection: verify the approved scope before carrying a quote

Before carrying an NYC special inspection agency quote, match each inspection required by the actual filing to a currently registered agency approved for that specific type. Then level the quoted visits, exclusions and report responsibilities. A registration number alone does not establish that the agency is approved for every inspection in the package, and a low fee does not resolve omitted work.

This is a quote-screening method for a chief estimator, not a list of approved firms or a determination of which inspections a project requires. Have the project design and filing team establish the applicable inspection schedule and verify current rules and agency records.

## Make five checks before comparing the fees

1. **Inspection schedule.** Obtain the project-specific filing and inspection requirements from the responsible design or filing professional. List each inspection type and the work or location it covers. Do not infer the complete schedule from a trade name.
2. **Registration.** Ask for the agency's legal name and registration details, then verify current standing. DOB says registration transactions are processed through [DOB NOW: Licensing](https://www.nyc.gov/site/buildings/codes/special-inspections.page). Its [SIA FAQ](https://www.nyc.gov/site/buildings/codes/sia-frequently-asked-questions.page) explains record verification and says a temporary reference number is not proof of registration. Use current DOB guidance for registration procedures rather than that older FAQ's procedural or fee answers.
3. **Type and class.** Check each type against the agency's approved scope. DOB's [Build FAQ](https://www.nyc.gov/site/buildings/industry/dob-now-build-faqs.page) directs users to the Skilled Trades Licensees Search in BIS for approved types. For applicable Class 1 work, DOB's [special inspections guidance](https://www.nyc.gov/site/buildings/codes/special-inspections.page) states that agencies performing those inspections must be accredited. Confirm the applicable class and accreditation scope; do not assume every inspection is Class 1.
4. **Actual quote.** Compare inspection types, planned visits, mobilizations, access assumptions, testing, reports, return visits and exclusions against the required schedule. Clarify whether a quoted allowance covers the expected scope and how additional work is authorized.
5. **Filing and handoff.** Identify who will appoint the agency under the applicable project arrangements, who will coordinate site access, and who will take and certify Technical Report responsibility. Confirm the agency accepts its assigned scope and the reporting handoff.

DOB describes special inspections as performed by inspectors on behalf of registered SIAs, and distinguishes DOB NOW registration from Technical Report responsibility and certification on its [special inspections page](https://www.nyc.gov/site/buildings/codes/special-inspections.page). Its [Build FAQ](https://www.nyc.gov/site/buildings/industry/dob-now-build-faqs.page) says a filing can be approved before the progress or special inspector is identified; identification is required by permit creation. Filing approval alone therefore does not demonstrate that the proposed agency is assigned.

## Illustrative two-agency worksheet

Assume the filing team has identified a particular special inspection type for a fictional project. The two proposals below are invented; neither is an approval or a live BIS lookup.

| Check | Agency A | Agency B | Estimator's next action |
| --- | --- | --- | --- |
| Registration and exact type | Registration details supplied; evidence of approval for required type omitted | Registration details and claimed type supplied | Verify current agency records and exact type for both; request missing evidence from A |
| Class and accreditation if applicable | Not established | Not established | Ask filing professional which class applies and obtain applicable accreditation evidence |
| Quoted visits | Initial visits described | Initial visits described; return visits excluded | Obtain basis and written return-visit terms; estimate potential excluded work separately |
| Technical Report handoff | Not assigned in proposal | Agency offers reports; appointment and acceptance not confirmed | Confirm responsible parties, scope and DOB NOW handoff with the filing team |
| Decision | Unresolved pending approval evidence | Unresolved pending verified approval and return-visit allocation | Carry neither as a complete comparable quote until gaps are resolved or explicitly treated and approved |

An omitted endorsement in a proposal is a missing proof point, not proof that Agency A lacks approval. Likewise, Agency B's exclusion is a commercial scope gap, not evidence of regulatory disqualification. Request clarification in writing. If the estimate must advance before answers arrive, record an explicit provisional treatment, its basis, decision owner and deadline. Do not present either quote as fully covered.

## Hand the open items to the contract review owner

Separate statutory qualification from who pays for each visit. The applicable project documents and arrangements determine appointment and commercial allocation; do not assume one universal owner-or-GC hiring rule. Ask the contract review owner to settle access, notice, return visits, reporting, coordination with trades and changes to the inspection schedule. If the GC carries a separate allowance, identify what is included and who approves the risk.

Use [qualification and package review](https://piper-ai.com/resources/subcontractor-prequalification-vs-bid-review) to keep agency eligibility evidence distinct from quote coverage. For a work interface that may involve an inspection, the [firestopping responsibility](https://piper-ai.com/resources/who-owns-firestopping-common-scope-boundary-problems) guide helps assign installation and coordination; it does not determine whether this project requires a particular inspection.
