# OGS construction MWBE goals: connect the utilization plan to trade coverage

For an OGS construction bid, test the utilization plan against the actual trade coverage and the solicitation's goals before locking the carry. A name on a plan is useful only if the firm is eligible, has an identifiable piece of the work and has a quote or other documented commitment consistent with the estimate.

[OGS guidance](https://ogs.ny.gov/mwbe/minority-and-women-owned-business-enterprises-frequently-asked-questions) says only Empire State Development-certified firms count toward state contract MWBE goals. Read the project-specific goals, forms, deadlines and counting instructions. Do not assume one percentage applies to all projects, or that ownership alone establishes eligibility. A firm can bid work without qualifying for goal credit.

## Turn goals into packages

For each prospective firm, retain the current certification evidence, trade package, quotation, proposed value, exclusions and outreach history. Compare the amount in the plan to the amount actually carried, and resolve overlaps with other quotes. Ask whether the package includes material, labor, delivery and coordination required by the bid documents. The [trade coverage review](https://piper-ai.com/resources/construction-bid-coverage-guide) should identify uncovered work separately from participation credit.

| Plan issue | Coverage question | Bid action |
| --- | --- | --- |
| Certified firm has no quote | Is there a defined package and capacity? | Obtain scope and price before relying on the value |
| Quote excludes installation | Who carries the missing installation? | Add back or obtain revised coverage |
| Goal remains short | What outreach and responses are documented? | Follow solicitation and OGS waiver instructions |

For example, an illustrative education project has a certified supplier quoted for doors, while the installation quote excludes hardware. The supplier's proposed value may support the plan if eligible under the project rules, but it does not resolve the hardware gap. The estimator should reconcile both the participation amount and installation responsibility before selecting the carry.

## Preserve the decision and evidence

OGS describes good-faith evidence such as solicitations, responses and the reasons firms were not selected, and directs contractors to consult it before requesting a waiver. Follow the actual solicitation's process; a waiver is not automatic. Keep the finalized plan, quote basis, outreach and unresolved issues together for operations. SDVOB participation has a separate certification and plan process, so do not count a firm under one program merely because it qualifies under the other.