# P-216BVRC - Design Build for Brownsville Recreation Center: project scope and procurement guide

DDC’s P-216BVRC design-build procurement covers replacement of Brownsville Recreation Center at Linden Boulevard and Mother Gaston Boulevard in Brooklyn. The June 2026 City Record describes demolition of the existing recreation and Golden Age centers, utility cutting, capping and abandonment, and a new center of more than 74,000 square feet with an indoor pool and two gym or basketball courts. [City Record: Brownsville Recreation Center design-build RFQ](https://a856-cityrecord.nyc.gov/RequestDetail/20260601039)

This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.

## Brownsville procurement and Golden Age phasing

The RFQ was archived when checked November 15, 2026, with an August 12 due date. A September 2026 DDC community presentation said the Golden Age Center would remain operational at least until 2028 and gave an overall project budget of $191 million. The budget is not a construction award. Neither source establishes the selected team or a firm construction start.

Sources for this project: [City Record: Brownsville Recreation Center design-build RFQ](https://a856-cityrecord.nyc.gov/RequestDetail/20260601039); [DDC Brownsville community update, September 2026](https://www.nyc.gov/assets/ddc/downloads/presentations/092126_BrownsvilleRecreationCenterCommunityUpdateMeeting.pdf); [City Record: earlier Brownsville reconstruction](https://a856-cityrecord.nyc.gov/RequestDetail?RequestId=20200318015).

## Demolition, utilities and continued service

The important reconciliation is between the RFQ’s eventual demolition and the later operating commitment. Map the existing service boundaries, temporary access and utility cutovers against a confirmed phasing plan before pricing demolition. Ask whether utility abandonment can occur independently for each building and who controls the release of the Golden Age Center. Do not assume closure dates or interim service locations.

## Pool, courts and design-build scope

For the replacement facility, seek the design criteria for pool systems, the two courts and their shared mechanical and electrical infrastructure. Separate design development, demolition, new construction and commissioning responsibilities in the design-build proposal. The publicly available nominal RFQ downloads were unreadable in this research; verify current procurement documents and amendments before preparing a price.

## Reconcile the project documents before pricing

Use the [DDC addenda and scope review](https://piper-ai.com/resources/nyc-ddc-addenda-scope-estimate-review) to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist). The NYC public project directory helps distinguish this package from other agency projects.