# Trans-Manhattan Expressway C-V2X Pilot: Scope and Procurement Forecast

The forecast describes a C-V2X pilot on the Trans-Manhattan Expressway, the New York approach between the George Washington Bridge and Alexander Hamilton Bridge. Its construction scope should be evaluated as a sensor-to-driver information chain, rather than priced as a single roadside device.

The proposed system uses high-resolution sensors and information channels including dynamic message signs, roadside alerts, data exchange and navigation messaging. The description says the pilot does not depend on in-vehicle sensors or connected-vehicle onboard units. A possible Stage 2, including the New Jersey side and other approaches, is conditional and is not established as the present pilot scope.

## Forecast reference and procurement timing

The [Port Authority construction forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists the following entry:

- **GWB C-V2X Deployment along TME (SMART GRANT)**: reference GWB243314; 2027 Q2 forecast procurement; published procurement approach SBE.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The [Port Authority construction procurements page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.

## Trans-Manhattan Expressway C-V2X Pilot estimating questions

These are questions for the issued documents, not confirmed contract requirements:

- Which sensors, communications paths, signs and interfaces are in the issued installation package, and which are supplied by others?
- Where are power, mounting and network connection points, and who owns integration and acceptance testing?
- What data exchange and application interfaces are actually specified, and what constitutes a completed pilot?

The forecast leaves a material gap: Device counts, connection points, testing criteria and Stage 2 authorization are not stated. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.

## Review the issued package

Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through [construction addenda](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). Use the [NYC public construction bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.

When actual project documents are available, Piper’s [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.