# Holland Tunnel New York and New Jersey Approaches: Scope and Procurement Forecast

The forecast describes removing and replacing pavement to a minimum depth of three inches at the Holland Tunnel approaches in New York and New Jersey. This is independent Piper analysis, not an agency notice. Research checked November 15, 2026.

## Forecast scope and procurement timing

The [Port Authority construction forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) identifies **HT224246** at Holland Tunnel. Its entries are:

- **Pavement Rehabilitiation At NY & NJ Approaches**: 2027 Q1 procurement forecast; published procurement approach: SCPP.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a forecast of procurement timing, not a bid deadline, construction start or guarantee of release. The [Port Authority construction procurement page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) explains the forecast context and directs readers to advertisements for active solicitations. Confirm current status there; this snapshot does not establish an open bid.

## Compare the two approach pavement limits

The work is at approaches on both sides of the Hudson, not exclusively in New York City. A three-inch minimum does not establish the full pavement section, separate locations or restoration quantities. Split the estimate by approach once limits and details are issued.

### Estimating investigation, not confirmed requirements

- What are the New York and New Jersey work limits and pavement sections?
- Where is deeper removal or repair contemplated, and how is it measured?
- How are transitions to existing pavement and associated restoration assigned?

Record each answer against the drawing, specification, schedule or clarification that establishes it. If the issued documents leave a boundary unclear, identify the affected trade carry and seek clarification through the solicitation process before relying on an exclusion.

## Before committing the bid team

Find the current advertisement, solicitation, drawings, specifications and all addenda, if issued. Match the reference and exact title, establish the document baseline, then compare scope assignments with the bid form and trade quotes. Check whether the actual procurement approach and requirements have changed since the forecast. The [NYC public construction bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) gives the team a review structure; use the [addenda management guide](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) when revisions arrive. The NYC public project directory provides a path to other named packages.

## Review the issued scope

Once the team has the relevant project documents, Piper's [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can help organize scope from documents the user supplies. The estimator still needs to check the output against the controlling documents and resolve the open interfaces before carrying a price.