---
title: 'JFK West Service Road and Taxiway A West: Scope and Procurement Forecast'
url: 'https://piper-ai.com/resources/pa-jfk154046-jfk-rehabilitation-of-restricted-vehicle-service-road-west-from-twy-ea-to-j2-bridge-project-guide'
description: 'Review JFK West Service Road and Taxiway A West scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.'
contentTypes: [guide]
publishedAt: '2026-11-20T00:03:21.502Z'
updatedAt: '2026-11-20T00:03:21.521Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# JFK West Service Road and Taxiway A West: Scope and Procurement Forecast

JFK154046 appears in two distinct forecast entries: rehabilitation of the west restricted vehicle service road from Taxiway EA to J2 Bridge, and rehabilitation of Taxiway A West. The service-road description has a defined pavement and traffic-device scope; the taxiway entry gives no comparable detail. Keep separate estimating bases until issued documents establish their relationship.

For the service road, the forecast describes at least three inches of asphalt concrete milling and overlay, striping, traffic device and sign rehabilitation, and maintenance of traffic. The Taxiway A West description says only that the taxiway will be rehabilitated. The shared reference does not establish one tender, award or combined quantity.

## Forecast reference and procurement timing

The [Port Authority construction forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists the following entries:

- **Rehabilitation of Restricted Vehicle Service Road - West (from TWY EA to J2 Bridge)**: reference JFK154046; 2027 Q2 forecast procurement; published procurement approach PA.
- **Rehabilitation of Taxiway A West**: reference JFK154046; 2027 Q3 forecast procurement; published procurement approach PA.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The [Port Authority construction procurements page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.

## JFK West Service Road and Taxiway A West estimating questions

These are questions for the issued documents, not confirmed contract requirements:

- For the road, where are the milling limits, tie-ins and traffic-device rehabilitation items?
- How do the drawings allocate traffic maintenance and restoration of markings during the road work?
- For Taxiway A West, what pavement, lighting, drainage or other scope is actually specified, if any?

The forecast leaves a material gap: Taxiway A West details and the relationship between the two forecast entries are not provided. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.

## Review the issued package

Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through [construction addenda](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). Use the [Airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.

When actual project documents are available, Piper’s [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.
