---
title: 'JFK Van Wyck storm pump system reconstruction | scope and forecast guide'
url: 'https://piper-ai.com/resources/pa-jfk164026-jfk-reconstruction-of-van-wyck-storm-pumps-system-project-guide'
description: 'Review the JFK Van Wyck storm pump forecast, including replacement pumps and controls, roadway drainage interfaces and scope questions for estimators.'
contentTypes: [guide]
publishedAt: '2026-11-19T16:23:35.173Z'
updatedAt: '2026-11-19T16:23:35.183Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# JFK Van Wyck storm pump system reconstruction | scope and forecast guide

The forecast describes replacing the Van Wyck storm pumps system serving the depressed roadway and the drainage outfall with a new pump system and controls. [JFK164026 in the Port Authority construction forecast](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx).

## Forecast reference and status

The [Port Authority forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists **Reconstruction of Van Wyck Storm Pumps System**, reference **JFK164026**, for **2027 Q4**. This is forecast procurement timing, not a bid due date or construction schedule. The forecast identifies the facility as John F. Kennedy International Airport. The [agency construction procurement page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) explains the forecast context; a forecast entry does not establish an active solicitation. Check current agency advertisements and issued documents before a bid decision.

This is independent Piper analysis of the forecast, checked November 15, 2026, not an agency notice. The forecast does not establish an award, construction start or final package boundaries.

## Scope boundaries for pumps and the drainage outfall

The pump equipment and controls have a common performance boundary with the roadway drainage and outfall. The description does not identify capacities, pipe limits or the means of keeping drainage service available during construction.

Record each unresolved boundary with its source and trade owner; confirm quantities in the issued documents before pricing.

## Questions for the issued documents

The following are estimating questions, not confirmed project requirements:

1. Where do existing and new pump-system limits meet the roadway drainage and the outfall?
2. What pump capacities, power, control and instrumentation requirements appear in the issued documents?
3. What temporary drainage or transition arrangements, if any, must the contractor provide and who accepts the completed system?

Request the solicitation, drawings, specifications, bid form and all addenda when issued. Compare the actual work limits and obligations to trade quotations, then document exclusions and unresolved interfaces before carrying a price. The [airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) helps structure that review; use the [addenda review method](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) if issued documents change. The public project directory provides a route to other named projects.

## Reviewing the issued facility documents

Once the team has the actual documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the user to help organize scope review. Estimators still need to resolve project-specific boundaries and price the work against the controlling documents.
