---
title: 'JFK Runway 22L Departure EMAS Replacement: Scope and Procurement Forecast'
url: 'https://piper-ai.com/resources/pa-jfk164030-jfk-replacement-of-runway-22l-departure-engineered-material-arrestor-system-emas-project-guide'
description: 'Review JFK Runway 22L Departure EMAS Replacement scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.'
contentTypes: [guide]
publishedAt: '2026-11-20T02:03:51.614Z'
updatedAt: '2026-11-20T02:03:51.625Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# JFK Runway 22L Departure EMAS Replacement: Scope and Procurement Forecast

The Port Authority forecasts design and construction of a replacement departure-end engineered material arresting system (EMAS) at JFK Runway 22L, including removal of the existing system. For preconstruction, the critical boundary is the handoff between removal, replacement design and the runway safety area, not a generic paving quantity.

The row expressly includes both design and construction. An estimate based only on supplying a replacement bed would miss the stated removal and design elements. Conversely, the forecast does not define the bed dimensions, the selected system or what happens to material removed.

## Forecast reference and procurement timing

The [Port Authority construction forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists the following entry:

- **Replacement of Runway 22L DEPARTURE Engineered Material Arrestor System (EMAS)**: reference JFK164030; 2027 Q1 forecast procurement; published procurement approach PA.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The [Port Authority construction procurements page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.

## JFK Runway 22L Departure EMAS Replacement estimating questions

These are questions for the issued documents, not confirmed contract requirements:

- What design deliverables, performance criteria and system supplier responsibilities will the issued documents assign?
- How are removal limits, disposal and preparation of the replacement footprint measured and assigned?
- What runway interface and acceptance sequence does the actual contract establish?

The forecast leaves a material gap: Bed geometry, design criteria, disposal and operational sequencing are not in the forecast. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.

## Review the issued package

Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through [construction addenda](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). Use the [Airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.

When actual project documents are available, Piper’s [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.
