title: 'LaGuardia Buildings 7 and 11 Fleet Chargers: Scope and Procurement Forecast'
url: 'https://piper-ai.com/resources/pa-laguardia-pa-fleet-charger-installation-at-buildings-7-and-11-project-guide'
description: 'Review LaGuardia Buildings 7 and 11 Fleet Chargers scope, forecast timing and estimating questions before reviewing the issued documents and preparing a bid.'
contentTypes: [guide]
publishedAt: '2026-11-20T04:08:38.037Z'
updatedAt: '2026-11-20T04:08:38.043Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# LaGuardia Buildings 7 and 11 Fleet Chargers: Scope and Procurement Forecast

The LaGuardia fleet charger forecast covers Buildings 7 and 11, with at least eight Level 2 ports at each location for light-duty vehicles, as well as Level 3 charging in the overall scope. The Level 3 quantity is not stated. Separate each location’s electrical and site carry before combining a project estimate.

The forecast anticipates breakers, conduits and wiring, charger foundations or pads, possible conduit overhang supports, signs and environmental work such as stormwater protection. These are forecast descriptions, not a final design or a confirmed bill of quantities.

## Forecast reference and procurement timing

The [Port Authority construction forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists the following entry:

- **PA Fleet Charger Installation at Buildings 7 and 11**: reference listed as TBD; 2027 Q3 forecast procurement; published procurement approach PA.

The workbook reference identifies the forecast entry; verify the solicitation identifier when an advertisement is issued. The quarter is a procurement forecast, not a bid deadline or construction start. The [Port Authority construction procurements page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) says forecast information is the public information available until a solicitation becomes active. This independent Piper analysis is not an agency notice or confirmation of an open bid. Research checked November 15, 2026.

## LaGuardia Buildings 7 and 11 Fleet Chargers estimating questions

These are questions for the issued documents, not confirmed contract requirements:

- How many Level 2 and Level 3 ports are specified at each building, and who supplies the equipment?
- What distribution capacity and routes serve each location, including breakers and conduit supports?
- Which pads, signs, drainage protection and startup tests are assigned at each site?

The forecast leaves a material gap: Level 3 quantities, equipment ratings, routes and final site designs are not stated. Record each open item with its source, a responsible reviewer and the assumed treatment in the estimate. Once drawings and specifications are issued, compare their limits and trade assignments before converting the forecast into a bid carry.

## Review the issued package

Start with the current solicitation, drawings, specifications and any referenced reports, then track changes through [construction addenda](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators). Use the [Airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) to connect project interfaces to the estimate. The NYC public project directory provides a route to other named forecasts.

When actual project documents are available, Piper’s [scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the team to prepare scope for review. The estimator remains responsible for resolving gaps and selecting the bid basis.