---
title: 'LaGuardia guard post barrier rehabilitation | scope and forecast guide'
url: 'https://piper-ai.com/resources/pa-lga124885-lga-rehabilitation-of-guard-posts-1-and-3-barriers-project-guide'
description: 'Review LaGuardia guard post barrier rehabilitation, including removal, proposed barrier equipment, pavement restoration and drainage interfaces for GCs.'
contentTypes: [guide]
publishedAt: '2026-11-19T13:06:33.252Z'
updatedAt: '2026-11-19T13:06:33.262Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# LaGuardia guard post barrier rehabilitation | scope and forecast guide

At Guard Posts 1 and 3, the forecast describes removing the existing barrier, foundation, hydraulic power units and associated electrical infrastructure, then installing a Global Grab Technologies Grab 300 grab-net barrier energy-absorbing cable system. It also describes guard post island, curb, pavement and drainage work. [LGA124885 in the Port Authority construction forecast](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx).

## Forecast reference and status

The [Port Authority forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists **LGA - Rehabilitation of Guard Posts 1 and 3 Barriers**, reference **LGA124885**, for **2027 Q4**. This is forecast procurement timing, not a bid due date or construction schedule. The forecast identifies the facility as LaGuardia Airport. The [agency construction procurement page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) explains the forecast context; a forecast entry does not establish an active solicitation. Check current agency advertisements and issued documents before a bid decision.

This is independent Piper analysis of the forecast, checked November 15, 2026, not an agency notice. The forecast does not establish an award, construction start or final package boundaries.

## Scope boundaries for the two guard posts

This is a barrier, civil and electrical interface rather than an equipment-only replacement. Existing removal and new installation both reach beyond the barrier itself, so separately identify restoration and drainage connections in the estimate.

Record each unresolved boundary with its source and trade owner; confirm quantities in the issued documents before pricing.

## Questions for the issued documents

The following are estimating questions, not confirmed project requirements:

1. Where do removal limits for foundations, hydraulic units, wiring and conduits end?
2. Who carries the new barrier system, its electrical connections and associated commissioning?
3. What are the island, curb, pavement and drainage restoration limits at each guard post?

Request the solicitation, drawings, specifications, bid form and all addenda when issued. Compare the actual work limits and obligations to trade quotations, then document exclusions and unresolved interfaces before carrying a price. The [airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) helps structure that review; use the [addenda review method](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) if issued documents change. The public project directory provides a route to other named projects.

## Reviewing the issued facility documents

Once the team has the actual documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the user to help organize scope review. Estimators still need to resolve project-specific boundaries and price the work against the controlling documents.
