# LaGuardia Taxiway B south of Taxiway F rehabilitation | scope and forecast guide

The forecast calls for milling and resurfacing existing asphalt concrete on the taxiway and shoulder to a minimum depth of 3 inches, overlay pavement markings, and rehabilitation of existing lighting, lighting support elements, guidance signs and drainage within paving limits. [LGA124889 in the Port Authority construction forecast](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx).

## Forecast reference and status

The [Port Authority forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists **REHABILITATION OF TAXIWAY B SOUTH OF TWY F**, reference **LGA124889**, for **2027 Q4**. This is forecast procurement timing, not a bid due date or construction schedule. The forecast identifies the facility as LaGuardia Airport. The [agency construction procurement page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) explains the forecast context; a forecast entry does not establish an active solicitation. Check current agency advertisements and issued documents before a bid decision.

This is independent Piper analysis of the forecast, checked November 15, 2026, not an agency notice. The forecast does not establish an award, construction start or final package boundaries.

## Scope boundaries for Taxiway B and its shoulder

The paving limits are also the stated boundary for the lighting, guidance and drainage work. Use those limits to reconcile civil quantities with electrical and drainage packages once the plans exist; the minimum depth is not a full pavement section.

Record each unresolved boundary with its source and trade owner; confirm quantities in the issued documents before pricing.

## Questions for the issued documents

The following are estimating questions, not confirmed project requirements:

1. What are the paving and shoulder limits and required pavement section beyond the stated minimum milling depth?
2. Which lighting, support elements, guidance signs and drainage features within those limits are rehabilitated, and by which trade?
3. How do markings and restored features relate to pavement transitions and completion stages in the issued plans?

Request the solicitation, drawings, specifications, bid form and all addenda when issued. Compare the actual work limits and obligations to trade quotations, then document exclusions and unresolved interfaces before carrying a price. The [airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) helps structure that review; use the [addenda review method](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) if issued documents change. The public project directory provides a route to other named projects.

## Reviewing the issued facility documents

Once the team has the actual documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the user to help organize scope review. Estimators still need to resolve project-specific boundaries and price the work against the controlling documents.