# LaGuardia Taxiways AA, BB, CC, DD, G, P and E rehabilitation | scope and forecast guide

The forecast identifies rehabilitation of Taxiways AA, BB, CC, DD, G, P and E from Taxiway E to Runway 13 Deck. It describes milling and resurfacing asphalt concrete on taxiways and shoulders to a minimum depth of 3 inches, overlay pavement markings and rehabilitation of existing lighting, support elements and guidance sign within paving limits. [LGA124891 in the Port Authority construction forecast](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx).

## Forecast reference and status

The [Port Authority forecast workbook](https://www.panynj.gov/content/dam/port-authority/construction-book/ConstructionProcurements.xlsx) lists **Rehabilitation of Taxiways AA, BB, CC, DD, G, P, and E**, reference **LGA124891**, for **2027 Q4**. This is forecast procurement timing, not a bid due date or construction schedule. The forecast identifies the facility as LaGuardia Airport. The [agency construction procurement page](https://www.panynj.gov/port-authority/en/business-opportunities/construction-procurements.html) explains the forecast context; a forecast entry does not establish an active solicitation. Check current agency advertisements and issued documents before a bid decision.

This is independent Piper analysis of the forecast, checked November 15, 2026, not an agency notice. The forecast does not establish an award, construction start or final package boundaries.

## Scope boundaries for the named taxiway segments

The named taxiways and the stated limits need to be reconciled on the drawings before quantities are assigned. Unlike the separate Taxiway B south of F description, this row does not expressly list drainage rehabilitation.

Record each unresolved boundary with its source and trade owner; confirm quantities in the issued documents before pricing.

## Questions for the issued documents

The following are estimating questions, not confirmed project requirements:

1. How do the issued plans define each taxiway segment and its shoulder limits?
2. What are the actual pavement sections, quantities and transitions at the named intersections?
3. Which existing lighting, support elements and guidance signs fall inside each paving limit, and who carries their rehabilitation?

Request the solicitation, drawings, specifications, bid form and all addenda when issued. Compare the actual work limits and obligations to trade quotations, then document exclusions and unresolved interfaces before carrying a price. The [airport scope and operational-interface review](https://piper-ai.com/resources/airport-construction-phasing-scope-review) helps structure that review; use the [addenda review method](https://piper-ai.com/resources/construction-addenda-management-for-gc-estimators) if issued documents change. The public project directory provides a route to other named projects.

## Reviewing the issued facility documents

Once the team has the actual documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with documents supplied by the user to help organize scope review. Estimators still need to resolve project-specific boundaries and price the work against the controlling documents.