---
title: 'Port sheds 4 and 5: separate dock repair from the bumper option'
url: 'https://piper-ai.com/resources/port-albany-shed4-shed5-dock-concrete-repair-case'
description: 'Price the historical Shed 4 and 5 dock fascia repair separately from optional bumpers, with a workface plan for active cargo loading.'
contentTypes: [guide]
publishedAt: '2026-11-18T07:12:00.708Z'
updatedAt: '2026-11-18T07:12:00.721Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# Port sheds 4 and 5: separate dock repair from the bumper option

For the Port of Albany's historical Shed 4 and 5 dock package, carry the fascia repair as the base and dock protection bumpers as a separately quoted option. Mixing them obscures both the base comparison and the owner's option decision. The [Albany Port District Commission RFP 2024-12](https://www.portofalbany.us/sites/default/files/2025-03/RFP-2024-12-Concrete-Repairs-SDVOB-set-aside.pdf), issued November 25, 2024, described approximately 2,800 square feet of loading-dock fascia across the connected sheds, from the north of Shed 4 to the south of Shed 5.

This was a land-side repair and resurfacing package, not a complete structural dock replacement or the separate maritime expansion procurement. The RFP described daily cargo loading at the docks. Its submission deadline has passed; the document is a historical pricing example, not a current invitation.

## Keep base repair and bumpers visible

| Price line | Historical package basis | Estimator handoff |
| --- | --- | --- |
| Base repair | Remove unsound concrete and condition edges; clean and treat reinforcement; saturate substrate; apply, finish and cure repair | Confirm surface area, actual depth, reinforcement condition, material and access assumptions |
| Bumper option | Dock protection bumpers separately quoted | Identify number and locations, anchors, substrate preparation and installation access in the option, not silently in base |
| Unresolved deterioration | Actual conditions after removal may differ from visible fascia | Document quantities and obtain the contract's required direction before expanding work |

Area alone does not establish removal volume. Ask bidders to state assumed average and maximum repair depths and how they will identify and measure deeper deterioration. Compare exclusions for reinforcement treatment and patch preparation before treating the lowest square-foot rate as comparable. Any unit rate or allowance must follow the issued bid form and contract, not a substitute estimator-created bid condition.

## Plan the workface around loading

A useful estimating sequence is to divide the fascia into manageable workfaces and map each to the loading positions it affects. For each workface, identify the access equipment and protection needed, how deliveries and personnel move around it, and who coordinates release back to operations. Ask the repair subcontractor to state the time and protection assumed for curing, and the superintendent to test that assumption against the owner's actual operating constraints.

This is a proposed planning method, not an owner-approved shutdown plan. Do not assume a night shift, a fixed closure window or an engineer's acceptance. Ask the owner and repair designer what inspection, curing evidence and release are required, and price any temporary barriers and repeat mobilization against the agreed plan. If the option is exercised, coordinate bumper anchorage with repaired concrete and its required cure rather than assuming installation can follow immediately.

## Verify package status and eligibility separately

The issued RFP restricted this particular solicitation to New York State certified service-disabled veteran-owned businesses. That historical condition does not establish eligibility for other Port work or a current procurement rule. Confirm current documents, qualification terms and addenda with the owner before pursuing any new package. The historical scope also does not establish final quantities or completed repairs.

Use the [project-stage guide](https://piper-ai.com/resources/albany-public-project-stage-preconstruction-guide) to separate historical solicitation evidence from a current notice, and [check estimate scope coverage](https://piper-ai.com/resources/construction-bid-coverage-guide) to reconcile the base and option across proposals.
