title: 'PV302BPH2 - CM Build Services for Snug Harbor, Staten Island Museum: project scope and procurement guide'
url: 'https://piper-ai.com/resources/pv302bph2-cm-build-services-for-snug-harbor-staten-island-museum-project-guide'
description: 'Staten Island Museum Building B: review CM-Build modernization, campus utility interfaces and the city’s planned education and historic restoration project.'
contentTypes: [guide]
publishedAt: '2026-11-20T00:56:43.232Z'
updatedAt: '2026-11-20T00:56:43.240Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# PV302BPH2 - CM Build Services for Snug Harbor, Staten Island Museum: project scope and procurement guide

DDC’s PV302BPH2 concerns CM-Build modernization of Staten Island Museum Building B at Snug Harbor and integration with campus utilities. The June 5, 2026 City Record solicitation was archived when checked November 15; its listed due date was July 9. [City Record: Staten Island Museum CM-Build](https://a856-cityrecord.nyc.gov/RequestDetail/20260601040)

This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.

## Building B procurement and project plans

A December 2025 city announcement described a planned STEAM education center, public collections and exhibition space, lab classroom and café, with historic exterior restoration, supported by a $6 million city funding announcement. Those plans are context, not a verified list of contract deliverables or a construction price. DDC described the project as front-end planning in March 2026; that historical update does not establish its current design or award status.

Sources for this project: [City Record: Staten Island Museum CM-Build](https://a856-cityrecord.nyc.gov/RequestDetail/20260601040); [Mayor: Staten Island cultural capital funding, December 4, 2025](https://www.nyc.gov/pl/mayors-office/news/2025/12/mayor-adams--staten-island-borough-president-fossella-celebrate-); [DDC CM-Build pilot update, March 25, 2026](https://www.nyc.gov/site/ddc/about/press-releases/2026/pr-032526-CMBuild.page).

## Museum and campus utility connections

For an estimator, the distinctive boundary is between Building B and shared campus utilities. Request a utility ownership and tie-in matrix showing existing capacity, connection points, outages and restoration. Then compare proposed interior uses against environmental and power requirements in the issued design. A café or collection space should not be priced as a confirmed work item solely from the announcement.

## Historic exterior and campus operations

Ask which exterior elements and approvals govern intervention, how adjacent campus operations are protected, and whether collections are present during work. Assign an owner to each unanswered question and keep the allowance separate from confirmed scope. The public RFQ downloads were unreadable in this research; obtain current contract documents and amendments to confirm the actual work and procurement status.

## Reconcile the project documents before pricing

Use the [DDC addenda and scope review](https://piper-ai.com/resources/nyc-ddc-addenda-scope-estimate-review) to reconcile issued revisions with the estimate. Record the controlling notice and unresolved obligations in the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist). The NYC public project directory helps distinguish this package from other agency projects.

For another museum project, compare the documented institutional needs and the limits of the public procurement evidence before defining protection and fit-out scope. See the Queens Museum renovation guide.