title: 'QED1063AC: separate Queens watermain shutdowns from package totals'
url: 'https://piper-ai.com/resources/qed1063ac-queens-watermain-shutdown-restoration-case'
description: 'Separate Queens street segments from the two-borough watermain total, then assign shutdowns, traffic controls and local restoration by workface.'
contentTypes: [guide]
publishedAt: '2026-11-29T00:21:01.528Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# QED1063AC: separate Queens watermain shutdowns from package totals

## A two-borough package, not a Queens-only quantity

The [February 6, 2025 QED1063AC presentation](https://www.nyc.gov/assets/ddc/downloads/presentations/QED1063AC-CB7Presentation.pdf) lists distribution-water-main segments in Queens and the Bronx and approximately 18,300 linear feet across the package. Do not carry that total as a Queens quantity. The presentation also identifies valves, hydrants, roadway trench restoration and local curb and sidewalk work, as well as traffic and shutdown interfaces.

The decision is to build a segment-level estimate before applying production or restoration assumptions. A package-wide length is useful as a reconciliation check, but it cannot establish the length, shutdown duration or surface treatment for an individual Queens street.

## A register for each workface

| Record | What to reconcile | Pricing consequence to investigate |
| --- | --- | --- |
| Segment and borough | Street limits and measured main length against the issued plans | Avoid assigning Bronx work to Queens or double-counting intersections |
| Isolation and service | Valve locations, shutdown sequence, notification and service arrangements | Separate planned shutdown activities from pipe installation production |
| Valves and hydrants | Count and limits of replacement, tie-ins and adjacent work | Identify excavation, fittings, testing and surface repair ownership |
| Traffic and access | Bus stops, pedestrian routes, staging and permitted working windows | Price protection, crew availability and any conditional off-hours work |
| Restoration | Trench footprint and any separately required curb or sidewalk limits | Avoid treating every sidewalk as full-width replacement or omitting local repairs |

Scheduled shutdowns and potential night or weekend work in the 2025 presentation are planning information, not proof of current approved windows. Confirm actual restrictions, notification duties, temporary service and the authority to isolate with the responsible parties. Tie any premium to an explicit assumed window and number of mobilizations instead of spreading an unexplained factor over all pipe.

## Reconcile underground work and the street surface

For each segment connect main installation, testing, backfill and temporary or final pavement to the relevant specification and responsible subcontract. The presentation describes sidewalk and curb work near hydrants as needed; it does not establish identical restoration at every segment. A hydrant excavation may have a different surface footprint from the pipe trench, so keep those quantities and assumptions distinct.

Request current plans, a segment quantity schedule and restoration limits before final carry. The [underground scope boundary guide](https://piper-ai.com/resources/plumbing-underground-scope-boundary) helps reconcile trade responsibility; the SEQPGRD1 location-by-location case illustrates why a package label should not substitute for a workface record. Current bid access and construction status are not established by the 2025 presentation.