# P.S. 101 Queens roof, flood elimination, masonry and playground project: SCA bid-stage guide

The NYC School Construction Authority's fiscal year 2027 [bid schedule](https://dnnhh5cc1.blob.core.windows.net/portals/0/Contracts/Bid/BidSchedule.pdf?si=DNNFileManagerPolicy&sig=0nrC4m88wZ87tfEkNZtMVjZzAaZrDrREnhozQIMLJHU%3D&sr=b&sv=2017-04-17) identifies solicitation **27-026775-2** for P.S. 101 in Queens as “Roofs/Flood Elimination/Exterior Masonry/Reso A Playground.” The official schedule snapshot checked November 17, 2026 lists an opening on November 18, 2026 at 10:00 a.m. and labels the entry CIP-Limited. The earlier November 15 research used a listing with a November 12 date; that earlier date does not control the current schedule. Confirm the controlling invitation and all addenda before acting; a scheduled opening does not establish eligibility or an outcome.

For a GC evaluating the package, the next decision is whether the actual solicitation and current agency information support further pursuit. The schedule identifies work categories, but it does not provide the issued drawings, specifications, addenda or enough information here to determine a firm's eligibility. It also does not establish an award or that the listed opening occurred as scheduled. This is independent Piper analysis, not an SCA notice.

## What the schedule tells the estimator

The four named workstreams belong to one listed solicitation. The label alone does not establish quantities, existing conditions, construction start, access windows or how the work is divided among trades. Confirm the controlling notice and all addenda through the [SCA reports index](https://nycsca.org/WS/Reports), which links to the bid schedule and bid lists. Check eligibility and current status against the actual procurement documents before committing pursuit resources. The [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) provides a way to record those checks.

## Test the boundaries between the four workstreams

Use the following as questions for the issued set, not descriptions of confirmed project requirements. Record the drawing or specification reference, responsible trade, quote inclusion and unresolved RFI for each answer.

- **Roof and exterior masonry:** Do roof-edge, flashing or wall details assign removal, substrate repair and reinstatement across different trades? If so, carry the same boundary in both quote requests and resolve any gap or overlap before leveling.
- **Flood elimination and roof drainage:** What sources and routes of water does the design address? Check whether roof drainage, below-grade work or other systems appear in the documents before assigning connections or pricing a remedy.
- **Masonry and playground:** Do elevations, site plans or details place playground work near facade work or temporary access? If they do, check who carries protection, access and restoration and whether the sequence affects subcontractor pricing.
- **Playground and flood elimination:** Do grading, drainage or surface details connect the two scopes? Compare limits on civil and playground sheets and identify who carries any shared excavation, backfill or surface reinstatement shown.

For example, if the issued details show a roof flashing termination at a masonry wall, ask the roofing and masonry bidders to identify their respective removal and reinstatement limits. Compare their written inclusions to the same detail. The condition is illustrative; the public schedule does not establish that this detail exists at P.S. 101.

## Get the documents before carrying a price

Obtain the invitation and complete issued drawing and specification set, including the document list and all addenda. Confirm the solicitation identifier, current status and any firm-specific eligibility with the SCA. Then reconcile sheet revisions and addenda with subcontractor quotations, qualifications and the estimate. Do not use the schedule's category labels as a takeoff or assume a particular scope split.

Review any actual work windows, site logistics, protection and sequencing provisions in the documents before carrying a schedule or general conditions cost. The [SCA school phasing review](https://piper-ai.com/resources/nyc-sca-school-construction-phasing-estimate) offers a method for that review without assuming that this school has a particular access restriction. Log missing information for an RFI where the procurement permits one, and keep unresolved assumptions visible in the bid decision.

## Reconcile P.S. 101 trade scopes

Once the contractor has the project documents, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can be used with those supplied documents to support a scope review. The estimator still needs to reconcile the resulting scope with the issued set, addenda and trade quotes. For other named packages, start with the NYC public project directory.