---
title: 'P.S. 305 Queens electrification, heat pump and roof project: SCA scope and bid-stage guide'
url: 'https://piper-ai.com/resources/sca-27-22359d-1-p-s-305-queens-electrification-heat-pump-and-roof-project-guide'
description: 'Review the P.S. 305 Queens SCA listing and the roof, heat pump and electrical scope boundaries to verify in the issued documents before pricing for the project.'
contentTypes: [guide]
publishedAt: '2026-11-17T07:10:02.708Z'
updatedAt: '2026-11-17T07:10:02.725Z'
author: 'Ido Gedanken, CEO'
readingTime: 2
---

# P.S. 305 Queens electrification, heat pump and roof project: SCA scope and bid-stage guide

A GC evaluating P.S. 305 in Queens should first verify eligibility and the issued package before pricing the roof and heat pump work. The [SCA bid schedule](https://dnnhh5cc1.blob.core.windows.net/portals/0/Contracts/Bid/BidSchedule.pdf?si=DNNFileManagerPolicy&sig=0nrC4m88wZ87tfEkNZtMVjZzAaZrDrREnhozQIMLJHU%3D&sr=b&sv=2017-04-17) lists solicitation **27-22359D-1** as CIP LTD, with the scope **DCAS Electrification/Heat Pump Systems/Roofs** and a scheduled bid opening of **November 19, 2026 at 10:00 a.m.** The schedule is not evidence that every firm can bid or that the opening remains unchanged.

This is independent Piper analysis of the public schedule checked November 15, 2026, not an agency notice. Check the controlling invitation, current schedule and addenda before acting. The [SCA reports index](https://www.nycsca.org/WS/Reports) links to the bid schedule.

## What the P.S. 305 schedule establishes

The schedule names the school, solicitation and broad work, but it does not provide quantities, detailed trade boundaries, construction start or school access. Full project documents and firm-specific eligibility were not available for this analysis. Confirm the solicitation's eligibility and submission terms before allocating a bid team. Use the [NYC public bid review](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) to record the controlling deadline, document revisions and open decisions.

## Test the roof and heat pump scope boundaries

These are questions for the issued set, not assertions that the conditions exist at P.S. 305. Record the drawing or specification reference, the trade assigned to respond and the estimate or quote affected.

| Interface | Question for the issued documents | Pricing decision |
| --- | --- | --- |
| Roof and mechanical equipment | Are equipment locations, supports or roof penetrations shown, and who furnishes and installs each component? | Compare mechanical and roofing quotes against the same detail and resolve exclusions. |
| Roofing and electrical distribution | Do electrical routes or equipment require roof penetrations or work at roof level? | Assign any specified penetrations, flashing and restoration to a responsible trade. |
| Existing roof and new work | What demolition, protection, tie-ins and restoration are actually detailed? | Separate existing-condition uncertainty from work explicitly included in the bid. |
| Sequence and access | What work windows, outages and access provisions are actually stated? | Build the estimate around documented constraints and seek clarification on unresolved dependencies. |

As an illustrative review, if a detail shows a rooftop equipment curb, compare the mechanical quote, roofing quote and issued detail for the curb, flashing and surrounding roof work. Record any gap or overlap, then request clarification if the documents do not settle responsibility. The schedule alone does not establish that this curb or any particular roof configuration exists.

## Build a defensible P.S. 305 bid file

Obtain the invitation, complete drawings, specifications and addenda for the identified solicitation. Track each revision against the roof, mechanical and electrical quotes and the estimate. Confirm documented access, temporary protection and outage provisions before setting a sequence; do not assume a school calendar or work window. The [SCA school phasing review](https://piper-ai.com/resources/nyc-sca-school-construction-phasing-estimate) provides a method for reviewing the actual contract constraints.

## Coordinate P.S. 305 trade scopes

With the contractor's project documents in hand, [Piper's scope-generation workflow](https://piper-ai.com/use-cases/scope-generation) can support a scope review. Compare the result with the issued drawings, addenda and subcontractor exclusions before carrying a price. The NYC public project directory helps locate other named packages.

Compare the two school electrification packages, especially their different listed work families and opening dates, before reusing a subcontractor scope. See the PS 171 Queens electrification and heat pumps guide.
