---
title: 'Shirley Chisholm Recreation Center: all-electric delivery and acceptance'
url: 'https://piper-ai.com/resources/shirley-chisholm-recreation-center-all-electric-delivery-case'
description: 'Use the completed East Flatbush center to examine pool, electrical, controls and stormwater handoffs in a design-build delivery.'
contentTypes: [guide]
publishedAt: '2026-11-28T02:06:54.100Z'
author: 'Ido Gedanken, CEO'
readingTime: 3
---

# Shirley Chisholm Recreation Center: all-electric delivery and acceptance

The Shirley Chisholm Recreation Center is a completed project, not a current bid opportunity. Its value to a preconstruction team is the acceptance problem: a pool, an all-electric building, individual space controls and stormwater facilities must work together and be usable by the owner. A design-build estimate should identify the people, testing and information needed at those boundaries, not just purchase and installation of the equipment.

In its [February 20, 2026 announcement](https://www.nyc.gov/site/ddc/about/press-releases/2026/pr-022026-SCRC-LEED.page), NYC Department of Design and Construction (DDC) reported that the $141 million center at 3105 Farragut Place in East Flatbush opened February 9. DDC described it as all-electric, delivered using design-build and meeting LEED v4 Platinum standards. The figure is the reported center cost, not a construction contract award.

## Translate building features into acceptance responsibilities

The following is an analytical review tool for a comparable project, not a record of this center's actual contracts, equipment selection or tests. DDC identifies a six-lane pool, individual lighting and HVAC controls, on-site stormwater management, LED lighting and enhanced indoor air quality. The source does not assign these handoffs among contractors.

| Interface | Question to resolve in the estimate | Evidence to request for acceptance |
| --- | --- | --- |
| Pool and building systems | Who supplies and connects pool equipment, power, controls and any related ventilation, and who supports integrated startup? | Approved equipment schedules, connection points, startup and witnessed test records |
| All-electric plant and distribution | What loads and power distribution are included, and who coordinates energization and startup? | Load and equipment schedules, electrical one-lines and documented startup responsibilities |
| Lighting, HVAC and controls | Who furnishes devices, programs space controls and demonstrates operation across packages? | Points list, control sequences, functional demonstration and training records |
| Stormwater and site | Who installs and tests the designed facilities and who takes over maintenance? | Approved site design, inspection or test requirements and maintenance instructions |
| Owner operations | Who compiles records, trains staff and resolves incomplete demonstrations? | Contract closeout requirements, operating manuals, training and outstanding-item log |

A useful pricing exercise is to follow one operating sequence from its control input to the equipment response. If a controls bidder includes programming but excludes attendance during equipment startup, the mechanical and electrical proposals may each assume that attendance is provided elsewhere. Carry the missing support explicitly, assign it to a bidder or seek clarification; do not count an assumed interface twice. The specific sequence and tests must come from the actual design and contract.

## Read sustainability claims in their proper context

DDC describes material choices intended to reduce embodied carbon, on-site stormwater management, enhanced indoor air quality and individual controls. These are project features and agency descriptions, not a guarantee that another recreation building will achieve the same outcome. The announcement also offers time and cost comparisons with a hypothetical traditional delivery approach and other buildings. Those comparisons are not measured market benchmarks and should not be transferred to an estimate as automatic savings.

For a future project, request the design criteria and acceptance deliverables behind the desired outcome: equipment and controls sequences, testing responsibility, maintenance access, operating instructions and the evidence required for the project's stated certification. Separate the price of documentation and demonstration from a performance promise that the available documents do not support.

## Apply the lesson to a new procurement

The [delivery-method comparison](https://piper-ai.com/resources/hard-bid-vs-cmar-vs-design-build-estimating-workflows) explains how the estimating workflow differs across hard bid, CMAR and design-build. On a design-build pursuit, maintain an interface register as design evolves: record the assumption, design revision, responsible party, price treatment and date by which the owner needs a decision. Move resolved items into the relevant scope and turnover obligations.

Before treating any public project as a pursuit, use the [NYC public bid review checklist](https://piper-ai.com/resources/nyc-public-construction-bid-review-checklist) against its own current solicitation. The center's opening and public description do not establish requirements or opportunities for another contract.
