# Sun Building electrical upgrade: identify the private-tenant exclusion before carrying power

A private-tenant area exclusion does not settle the shared electrical service boundary. Carry the building-wide upgrade and identify how excluded areas are affected before assuming a shutdown or a connection is somebody else’s work.

## The documented building and exclusion

The agency describes a legacy electrical system, some risers and panels supplemented in a 2002 renovation, proposed power monitoring and increased emergency generator capacity. It says approximately 15% of the building, private-tenant areas on the first and second floors, is excluded. The [NYC Capital Projects Dashboard May 2026 agency record: PW316EL](https://data.cityofnewyork.us/resource/fb86-vt7u.json?$where=reporting_period%3D%27202605%27%20AND%20managing_agency%3D%27DDC%27%20AND%20fms_id%3D%27PW316EL%27) lists the phase as Design in its May 2026 reporting period. Its agency data date is 2026-06-15. This is a source-dated narrative, not evidence of a live tender, an award or observed physical progress.

## Assign the interfaces before carrying the price

| Interface | Scope or question | Estimator review |
| --- | --- | --- |
| Existing distribution | Identify retained and replaced risers and panels. | Survey and trace circuits before fixing a quantity. |
| Power monitoring | Locate metering, communications and connections. | Define equipment and controls ownership. |
| Emergency generator | Define new capacity and distribution in the design. | Assign cutover and testing. |
| Excluded tenant space | Separate physical work exclusion from shared service effects. | Confirm access, notification and outage responsibility. |

The table is estimator analysis, not an owner scope assignment. Compare the issued drawings and specifications with each bidder’s qualifications. Record the drawing revision and the package that accepts each connection, restoration and test.

Use a one-line diagram and circuit schedule as the common reference when available. Mark each panel and riser as retained, modified or unknown, then list which areas depend on it. A monitoring allowance should identify the metering points and communications route; a generator allowance should identify what distribution and cutover work is included. These are questions for the issued design, not findings about the existing installation.

## Work exclusion versus service continuity

Illustrative estimator analysis: a riser serving an excluded tenant area may pass through a scope boundary. The estimator should ask the designer to identify the actual circuits and the owner to state allowable service interruptions. Carry any confirmed temporary supply, reconnection and testing under a named package; do not assume either that tenant work is included or that no coordination is needed.

The agency narrative is a design-phase record, not a circuit survey or issued shutdown plan. Establish the current system and tenant agreements before pricing the boundary.

For the next review, use the [electrical bid exclusions](https://piper-ai.com/resources/common-electrical-bid-exclusions-gcs-should-review) and [subcontractor exclusions review](https://piper-ai.com/resources/review-subcontractor-exclusions-and-qualifications) to carry the selected assumptions into trade scope.