# Tenant improvement allowances: separate the lease budget from the contractor’s scope

A tenant improvement allowance is generally a lease-related funding arrangement for defined improvements. Its amount does not by itself establish the complete construction scope or the contractor's price. A GC preparing an office or retail fit-out estimate should distinguish the lease's funding terms, the issued work requirements and the construction agreement being proposed.

Do not confuse a tenant's available contribution with a construction-contract allowance. [AIA's construction allowance guidance](https://learn.aiacontracts.com/articles/construction-allowance-contracting-basics/) addresses the latter. The lease and construction agreement must each be reviewed by the responsible parties for the actual project.

## Establish the landlord and tenant work boundaries

Obtain the issued work letters, design information and landlord criteria relevant to the package. Identify which party provides existing services, base-building work, access, protection and final approvals. Confirm the source rather than relying on a broker's summary of a funding amount.

An illustrative HVAC package may assume that base-building capacity is available while the landlord's documents leave an upgrade with the tenant. That boundary can change the estimate even when the proposed tenant layout stays the same.

## Price the full proposed construction work

Use the [scope-generation review](https://piper-ai.com/resources/construction-scope-generation-guide) to define demolition, preparation, installation, interfaces, testing and restoration. Identify which work is included in the GC's proposal and which is expressly outside it.

Keep funding eligibility separate from scope necessity. An item can be required for the project while its reimbursement treatment remains a lease question for the owner and advisers.

## Preserve assumptions about selections and existing conditions

Record the basis of unresolved finishes, equipment selections and existing-system information. Where a construction allowance is proposed, state what it covers and how related work is treated. The [contingency and allowance comparison](https://piper-ai.com/resources/construction-contingency-allowances-estimate-review) helps prevent one vague reserve from concealing several different decisions.

Do not assume the lease funding amount can absorb unknown scope without review. The contractor still needs a supported basis for the number it is prepared to commit to.

## Review the operating and approval sequence

Identify access dates, occupied-building restrictions, landlord review dependencies and the condition required for turnover. Check whether proposals and the cost plan assume the same sequence.

For a [GMP proposal](https://piper-ai.com/resources/guaranteed-maximum-price-estimate-review), reconcile that basis with the qualifications and unresolved decisions submitted for acceptance. A funding deadline and a construction completion milestone may create different constraints.

## Keep the required work visible in the estimate review

Piper's [Scope Generation](https://piper-ai.com/use-cases/scope-generation) and [Final Bid Review](https://piper-ai.com/use-cases/final-bid-review) connect the project requirements, trade scopes, proposals and estimate. They can help the team identify an interface or qualification that needs a pricing decision.

The landlord, tenant and their advisers still determine lease obligations and reimbursement. The GC approves the work and assumptions represented by its construction proposal.