# How to write a takeoff request an AI agent can execute

1. Define the work boundary and pricing distinctions before asking for quantities.
2. Request an item inventory before detailed measurement, including unresolved items.
3. Keep alternative measurement conventions separate rather than blending them into one total.
4. Require source-backed quantities and explicit questions, not a declaration that the takeoff is complete.

For a GC estimator checking trade coverage on a commercial hard bid or preparing a DD pricing package, an executable agentic takeoff request needs six things: **a work boundary, an item list, source sheets, units, measurement conventions and instructions for unresolved scope.** “Take off the concrete” is not enough. It leaves the agent to decide what belongs in the package and what a useful quantity means.

Our position is straightforward: delegate measurement, not the definition of the pricing commitment. Write the request at the same grain you intend to compare, price or carry. Keep quantities that depend on an unresolved convention separate until the estimator chooses the basis.

The template below is a proposed work instruction, not a benchmark or a promise that every agent can execute every part. Use it only with a workflow that lets you inspect and correct the underlying measurements. It does not replace a takeoff plan, a scope review or design resolution.

## Define the pricing decision before the measurement task

Begin with what the quantity will support. A GC checking a paving quote needs a different breakdown from a self-perform estimator developing a placement estimate. At DD, some components may belong in a question register rather than a measured total.

A useful opening is:

> Prepare quantities for GC review of the new site paving package in the base bid. Separate asphalt courses, aggregate base and preparation work. Do not price the work or resolve missing design information.

This tells the agent what decision the output serves and what authority it does not have.

Use **bid grain** to mean the smallest distinction that changes your pricing or coverage decision. That might be slab thickness and finish, pipe diameter and material, or fixture type and mounting condition. It need not mean one line for every object. It means not combining work you will later need to separate.

Keep the boundary between [construction takeoff and estimating](https://piper-ai.com/resources/construction-takeoff-vs-estimating) explicit: this request creates quantities and their basis, not the final carry number.

Before writing the request, complete this sentence: “I need these quantities to decide whether \_\_\_.” If the answer is only “the takeoff is complete,” the task still lacks a useful acceptance basis.

## Write the boundary in terms of work, not just page selection

Specify the building, level, zone, phase and bid option. Then name the documents that establish those limits.

A sheet list alone does not define the work boundary. For your request, distinguish three roles:

- **Measurement sheets:** plans, elevations or sections on which the extent will be measured.
- **Interpretation sources:** legends, schedules, details and specification clauses that establish type, dimension or inclusion.
- **Comparison sources:** another view or schedule used to question the result, without counting the same element again.

For an illustrative site package, write: “Measure new work inside the base-bid limit on the civil plans. Use utility sheets to identify crossings and lighting sheets to identify shared supports. Do not measure their background paving again.”

State which revisions are current and identify excluded alternates. If the documents conflict, instruct the agent to preserve both references and flag the affected item. Do not ask it to invent a document-precedence rule. For the wider handoff, see how [drawing revisions change scope, bids and the estimate](https://piper-ai.com/resources/drawing-revisions-cascade-scope-bids-estimate).

Every exclusion should explain its treatment: outside this package, counted elsewhere, existing to remain, or unresolved. “Exclude electrical” is too broad if your paving task still needs to identify concrete pads shown on electrical details.

## Request the item inventory before detailed measurement

Ask for a first pass that lists the item families, intended units and source basis. Review that inventory before commissioning detailed quantities.

This is a proposed control, not a claim about measured performance. Its purpose is to expose a missing family before the team spends its review effort refining the families already listed.

The trade package matters. [UFGS 03 30 00, Cast-in-Place Concrete](https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2003%2030%2000.pdf), February 2019 with Change 10 dated August 2025, addresses reinforcement, waterstops, vapor retarders, joint materials and finishes as well as concrete. Its designer notes call for section dimensions, reinforcement cover, material strengths and finish locations on the drawings. These are guide-specification provisions, not automatic requirements for every commercial concrete package.

The estimating implication is to test the inventory against more than the concrete outline. Ask which companion items the project actually specifies, where their extent comes from and whether they belong in this task.

Use this instruction:

> List every requested item family before refining quantities. Include companion items identified in the supplied details or specification sections. Classify each as measurable, derivable from an explicit rule, or unresolved. Do not omit an item because its quantity is unavailable.

The same distinction applies to irrigation. [UFGS 32 84 24, Irrigation Sprinkler Systems](https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2084%2024.pdf), August 2011 with Change 1 dated May 2017, separately addresses heads, valve families, backflow preventers, controllers, control wiring, conduit and accessories. A request limited to heads and pipe should therefore say that it is a partial task, not describe its output as the whole irrigation package.

## Specify conventions that can change the number

Units alone do not define a quantity. “Linear feet” still leaves a choice between route length and total length of several pipes sharing that route. “Square feet” still leaves questions about gross area, deductions and which face is included.

Define these choices in the request. Use these proposed instructions where applicable; they are not universal measurement standards:

- **Concrete:** request volume by element, type and design dimensions. Preserve gross geometry, deductions and net volume.
- **Paving:** request area and compacted thickness by course. Preserve area, thickness and volume, with the stated density basis for any mass conversion.
- **Pipe:** request length by diameter, material and system. Define the horizontal or developed basis and keep documented vertical or sloped additions separate.
- **Shared trench:** count physical trench routes independently of pipe totals. Preserve trench length and individual pipe lengths as different quantities.
- **Wall surface:** identify each included face and its height source. Preserve face areas and openings before rollup.
- **Repeated equipment:** count equipment and supports as different families. Retain the mounting conditions that explain their relationship.

### Use the both-numbers rule only for a real unresolved choice

When two conventions could change the quantity and the project has not settled the choice, request both numbers under distinct labels. Keep their underlying subquantities so the estimator can change the basis without discarding the measurement.

**Illustrative example:** two pipes each follow the same 100-foot route. Report 100 feet of shared route and 200 feet of pipe, split by pipe type. These are not competing answers to one question. They answer different pricing questions. Do not add them together or use pipe footage as the trench quantity.

For a sloping run, request horizontal length and developed length only where the supplied geometry supports both. If elevations or slope information are missing, request the measured plan length and flag the missing basis. “Give both numbers” is not permission to invent the second one.

Once the convention is settled, identify the selected basis and retain the alternative for explanation. Do not clutter every item with alternatives that have no bearing on the decision.

### Separate design quantity from procurement and payment quantity

Tell the agent not to insert a waste factor, stock allowance or density from memory. Any adjustment should have an explicit team-supplied or document-supplied basis and remain separate from measured geometry.

Contract measurement can also differ from drawing measurement. The unit-price option in [UFGS 32 12 15.13, Asphalt Paving for Airfields](https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2032%2012%2015.13.pdf), November 2020 with Change 1 dated May 2022, measures asphalt mixture by weight after mixing for accepted work. The guide also directs surface preparation requirements for aggregate base, milling, tack and prime coats to pertinent additional sections.

For a request on a project using that provision, label an area-and-thickness-derived tonnage as an estimating quantity, not an observed payment quantity. Also name the preparation sections to inspect. This airfield provision is not a default payment rule for a commercial parking lot.

## Tell the agent what must become a question

“Flag anything unusual” gives the reviewer no defined queue. Name the conditions that require a question, and specify what the question should contain.

Request flags for:

- A referenced sheet, schedule or detail missing from the supplied package.
- Conflicting dimensions, types, schedules or revision information.
- An item listed in the requested inventory without an established measurable extent.
- A continuation beyond the work boundary or an unresolved match-line connection.
- Existing, demolition and new-work status that cannot be resolved from the supplied documents.
- A quantity dependent on a text rule, unspecified dimension or unsupported conversion.
- A scope inclusion that may be priced in a parent item rather than as a separate add-back.

Each flag should name the item, source location, unresolved issue and affected quantity. Ask the agent to distinguish the quantity it can establish from the portion it cannot.

Prefer “Measured plan run available; vertical extent unresolved at riser detail” to either an unexplained zero or an invented complete run.

Your acceptance language should be: “All requested families accounted for, with measured or derived quantities and unresolved portions identified.” Do not make “No questions remain” the condition for finishing. It rewards closure when the correct output may be a question.

## Reusable agentic takeoff request template

Replace the bracketed fields and remove clauses that do not apply. This is a proposed task brief, not a product command syntax.

> **Decision and stage:** Prepare quantities for [GC trade-quote check, self-perform estimate or DD package review] on [sector and delivery method]. Do not price work or make design decisions. >**Work boundary:** Include [building, level, zone, phase and base bid or alternate]. Use [document and marked limit] to establish the extent. Identify continuations outside that limit as questions. >**Current sources:** Use [sheet identifiers and revisions], with [legends, schedules, sections, details and specification sections] for interpretation. Exclude [superseded sources]. Flag conflicts without silently choosing a basis. >**First pass:** List the requested item families, units, source basis and companion items before detailed measurement. Account for each family as measurable, explicitly derivable or unresolved. >**Item breakdown:** Separate quantities by [type, size, material, thickness, height, finish, level or phase]. Do not merge distinctions needed for pricing or coverage review. >**Measurement conventions:** Use [units and conventions]. Preserve gross extent, deductions and additions where relevant. Keep shared-route quantities separate from individual system quantities. Where a specified convention remains unresolved, report both supported quantities under distinct labels. >**Inclusions and exclusions:** Include [named work]. Exclude [named work and reason]. Identify work counted by [other package or task] rather than silently dropping it. Apply typical details only to established occurrences or extents; flag uncertain applications. >**Adjustments:** Do not add waste, spare stock, procurement rounding or unsupported conversion factors. Use only [approved inputs], clearly separated from the drawing quantity. >**Return and flags:** Return editable source measurements, item quantities, convention labels and a question register. Identify source location and affected quantity for missing references, conflicts, uncertain status and unsupported extents. Keep unresolved quantities separate from carry-ready quantities.

Assign a reviewer to approve the first-pass inventory and the completed measurements. Do not put an instruction in the brief that the chosen workflow cannot expose for review.

## Trade examples that change the request

These are **illustrative requests for hypothetical drawing packages**, not completed tool tests. Replace every sheet reference and item definition with the actual project basis.

### Structural concrete: distinguish volume from package coverage

> Take off new foundation and ground-floor concrete inside the building limit using the current structural plans, footing schedule and referenced sections. Separate spread footings by type, continuous footings by section, walls by thickness and segment height, and slabs by thickness and finish. Return concrete in cubic yards, with gross dimensions and deductions retained. Inventory reinforcement, formed surfaces, waterstops, vapor retarder and specified joints separately; measure only where the supplied documents establish the basis. Do not derive concrete dimensions from reinforcement cage dimensions. Flag missing sections, conflicting levels and companion items without measurable extents. Exclude site concrete assigned to the civil package, naming those exclusions.

The request does not ask one volume total to prove coverage of the package. It makes the distinction between a measurable concrete element and a companion item requiring its own basis.

### Irrigation: distinguish network measurement from connection scope

> Take off new irrigation inside the landscape work limit using the current irrigation plans, legend, valve details and controller diagram. Separate pipe by diameter and material, mainline from laterals, and each valve and head family. Count controllers, sensors, backflow assemblies, boxes and shown connection components separately. Report shared trench routes separately from pipe lengths where co-location is documented. Inventory control wiring and conduit using their own source basis. List required spare stock separately from installed counts. At the water-source connection, distinguish new work from existing equipment and flag any unresolved connection component or extent.

The spare-stock instruction has a concrete source basis: UFGS 32 84 24 includes an **Extra Stock** article separate from its installation provisions. Use the project's edited requirement, not the guide's bracketed defaults.

### Site lighting: distinguish luminaires from their supports

> Count new luminaires by schedule type using the current lighting plan and referenced mounting details. Separate single-head and multi-head arrangements, poles by type and height, wall-mounted units and units mounted on another structure. Return luminaire counts and support counts separately. Inventory foundation types, mounting arms, brackets, grounding and controls from the supplied details. Do not apply a pole foundation to a wall-mounted unit. Identify the source and ownership of supply-route quantities, and flag missing foundation details or mounting conflicts.

[UFGS 26 56 00, Exterior Lighting](https://legacy.wbdg.org/FFC/DOD/UFGS/UFGS%2026%2056%2000.pdf), August 2021, separately addresses luminaires, controls, poles, brackets, foundations and grounding. Its designer notes call for mounting heights and accessories on the drawings. That supports the request's family distinctions, not an assumption that every luminaire carries the same assembly.

### Asphalt paving: distinguish courses from preparation work

> Measure new base-bid paving inside the marked limit using the current paving plan and typical sections. Separate each asphalt course by thickness and mix designation. Return area and compacted volume by course. Convert to tons only using the supplied density basis, retaining that input. Measure aggregate layers from their own shown extents, not automatically from the surface polygon. Inventory milling, tack, prime, tie-ins and restoration against their referenced sections. Exclude alternate paving, identify shared boundaries once and flag missing layer extents. Keep any contract payment basis distinct from the estimating quantity.

The key instruction is not “be accurate.” It is “do not let one surface boundary become the assumed extent of every layer and interface.” That is a task definition the reviewer can challenge.

## Define the return before releasing the task

Require three outputs: the item inventory, reviewable measurements and unresolved questions. A summary total alone cannot satisfy this proposed brief.

Do not bury all uncertainty in a general disclaimer. Keep the affected item and quantity next to the question. Keep scope ownership separate from measurable extent: work can be visible but outside your package, or included in your package but not yet measurable.

For downstream organization, use [takeoff items, assemblies and formulas](https://piper-ai.com/resources/takeoff-items-assemblies-formulas); for the separate acceptance process, use [how to check an AI takeoff before carrying it](https://piper-ai.com/resources/how-to-check-an-ai-takeoff).

## Turn the defined task into editable measurements in Piper

In [Piper's takeoff workflow](https://piper-ai.com/use-cases/takeoff), the estimator describes the quantity and scope needed. The agent reads the drawing, uses measurement and assistance tools, and creates editable measurements grouped into items. Measurements stay attached to their source sheets for review.

Assisted takeoff is different: the estimator uses tools that propose room boundaries, trace connected lines or find similar symbols, then inspects and corrects the candidates before applying them. The distinction between [assisted and agentic takeoff](https://piper-ai.com/resources/assisted-vs-agentic-takeoff) changes what you delegate and what you review.

Piper supports both workflows, along with manual takeoff from PDF drawings, in one editable takeoff file. Review sheet selection, scale, source geometry, item assignment and unresolved scope before carrying quantities. The request defines the work; it does not certify the result.

### How detailed should an agentic takeoff request be?

Include enough detail to prevent a choice that would change your pricing or scope decision. Define the boundary, source set, item distinctions, units, conventions and flags. Avoid a long narrative of instructions that do not affect the output. A short task with an explicit basis is more useful than a broad request for completeness.

### Should I provide an item list or ask the agent to create one?

Provide your required families and ask for a first-pass inventory that also identifies document-supported companion items. Review that inventory before detailed measurement. Treat it as a coverage proposal, not proof that every obligation has been found. Keep unresolved families visible rather than allowing missing quantities to remove them from the list.

### What if two measurement conventions are possible?

Request both supported quantities under distinct labels and keep the underlying subquantities. State which basis remains undecided. Do not blend route length with individual pipe length, or measured geometry with waste. If the second quantity needs missing information, flag that missing basis instead of asking the agent to manufacture an answer.

### Can a clear request replace estimator review?

No. In Piper, agent-created measurements remain editable for estimator review of source sheet, scale, geometry and item assignment. A clear request gives that review a defined acceptance basis. The team still needs to check coverage, resolve open scope and decide which quantities and assumptions belong in the estimate.