---
title: 'Takeoff'
url: 'https://piper-ai.com/use-cases/takeoff'
description: 'Measure areas, lengths, and counts from construction drawings. Manual, assisted, and agentic takeoff with editable measurements and grouped quantities.'
updatedAt: '2026-11-18T15:30:29.076Z'
---

# Construction Takeoff, Your Way

Turn complex drawing sets into quantities you can check. Measure by hand, use tracing and matching assistance, or ask Piper to build a takeoff. Review and edit the measurements on the source sheets.

Piper measures areas, lengths and counts from construction drawings in editable takeoff files.

Estimators can draw measurements manually, use assisted room tracing and symbol matching, or ask the agent to build a takeoff.

It is built for general contractors' preconstruction and estimating teams.

Measurements stay on their source sheets, with scale, grouped quantities and reviewable geometry. Estimators review assisted and agent-created measurements before using them.

## The quantity is only useful if you can see what was measured

A complex set means repeated rooms, dense symbols, multiple scales, and details spread across sheets. Measuring the work also means checking what was included, what was missed, and which assumptions sit behind the total.

### Today

Trace every room and run by hand. Count repeated symbols one at a time. Reconcile quantities with a separate spreadsheet and reopen the drawings when someone questions a total.

### With Piper

Choose manual, assisted, or agentic takeoff in one editable file. Inspect the measured geometry on each source sheet, correct it, and roll quantities up by item.

## Three ways to measure. One takeoff to review

Choose how much of the measurement work you hand to Piper

### 01. Set up the drawings: Start with the sheets and scale

Bring your drawing PDFs into a takeoff, select the sheets, and set or calibrate their scale. Keep each measurement attached to the drawing page it came from.

### 02. Manual: Draw the measurement yourself

Draw areas, linear runs, wall surfaces, and counts. Add deductions and adjust geometry on the sheet. Use curved measurements and repeated units where the work calls for them.

### 03. Assisted: Trace rooms and find similar symbols

Click inside a room to propose its boundary, follow connected drawing lines, or select an example to find similar symbols. Inspect candidates, correct boundaries, and check for missed or unrelated matches before applying them.

### 04. Agentic: Ask Piper to build the takeoff

Describe the quantity and scope you need. The agent reads the drawing, uses measurement and assistance tools, and creates editable measurements grouped into items. Review the source geometry, scale, and unresolved scope before carrying the quantities.

## Keep the basis behind the total

### Areas and deductions

Measure floor areas and net out openings or excluded regions.

### Lengths and surfaces

Trace runs and use height or thickness inputs for the quantities the item needs.

### Counts and repeated work

Count points and review similar-symbol candidates against the actual drawing.

### Items, catalogs, and formulas

Roll measurements up by item, classify them through catalogs, and apply your price-book references and formulas.

Your team owns the measurement review and the number it carries

## A takeoff your team can inspect, correct, and use

### Choose the right starting point

Measure manually where judgment matters, use assistance for repetitive work, and give the agent a defined measurement task.

### Review on the drawing

Check the sheet, scale, boundaries, deductions, and count locations behind each quantity instead of accepting an unexplained total.

### Work in the project context

Keep takeoff alongside drawings, specifications, trade scopes, and bid review in Piper. Quantities support the estimate; scope and pricing assumptions still need review.

- WJ Construction
- Lozier
- Manhattan Management

Put a checkable quantity behind the estimate

## See takeoff on your drawings

Bring a complex drawing set. Walk through manual measurements, assisted tracing and matching, and an agent-created takeoff your team can inspect and edit.

## What estimators ask about takeoff

### Does Piper do construction takeoff?

Yes. Piper supports manual, assisted, and agentic takeoff from PDF drawings. Measure areas, lengths, wall surfaces, and counts in editable takeoff files, with quantities grouped by item.

### What is the difference between manual, assisted, and agentic takeoff?

Manual means you draw the measurements. Assisted means tools propose room boundaries, trace connected lines, or find symbols similar to an example you select. Agentic means you give Piper a measurement task and it uses the tools to build an editable takeoff for review.

### Can we check and change what the agent measures?

Yes. Agent-created measurements are editable in the same takeoff viewer as manual measurements. Review their source sheet, scale, geometry, and item assignment, then correct or remove measurements as needed.

### Does assistance automatically produce a complete takeoff?

Assistance provides a starting point. Dense linework, open boundaries, symbol variants, and drawing quality can affect the result. Review the suggestions, check for omissions, and use manual corrections where needed.

### Can we connect quantities to pricing?

Yes. Group measurements into items, reference classification and price-book catalogs, and use formulas for your quantity and cost calculations. Your team supplies and reviews the pricing basis.

### Is takeoff the same as scope generation?

Takeoff measures how much work is shown. Scope generation defines the work each trade carries. Piper supports both, so you can review quantities alongside the requirements and responsibilities behind the estimate.

## Related workflows

- [Scope Generation](https://piper-ai.com/use-cases/scope-generation)
- [Final Bid Review](https://piper-ai.com/use-cases/final-bid-review)
