AGC MA passive house builder training January 2027: choose the project role before buying a seat
Choose the January builder course by field responsibility, then plan the enclosure, installation and QA questions the learner should bring back.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
Choose the January builder course for a person who can use the learning in field execution: installation sequence, enclosure continuity, quality records and trade handoffs. Give that person a project task before reserving the seat, and keep independent verification as a separate role decision.
The January builder cohort and its field focus
AGC MA lists a builder course in Wellesley January 27–29, 2027, with self-paced content followed by three in-person days and an exam after instruction. The organizer describes airtight enclosures, windows, field QA and site management. Recheck schedule and enrollment terms. Source: AGC MA passive house builder training January 2027: choose the project role before buying a seat.
Give the learner an enclosure handoff to investigate
The questions below are a suggested preparation tool; they are not announced session findings or project requirements.
| Item | Evidence or topic | Question and next evidence |
|---|---|---|
| Envelope detail | Field lead reviews the detail with the designer. | Identify the continuity point and unresolved construction sequence. |
| Windows and interfaces | Installer and adjacent enclosure trades coordinate their boundaries. | Request the approved detail and the inspection or QA record required by the project. |
| Airtightness and field QA | Field team prepares work for the assigned testing party. | Identify access, readiness, documentation and correction responsibilities. |
| Site management | Superintendent sequences trades and protects completed work. | Confirm who records issues and obtains designer direction. |
Bring installation and QA questions back to the team
Use the table as a suggested handoff exercise, not a course syllabus or a substitute for project specifications. An estimator can ask the attendee to return with questions for the envelope scope, the intended QA evidence and any trade boundary that needs a priced clarification.
Separate builder execution from verification
This course suits a field implementation role; an independent testing or verification role calls for a separate review of verifier training and prerequisites. Attendance alone does not certify a building or confer design authority. Confirm the requirements and project-specific role before purchase.
After training, bring the unresolved installation and QA handoffs into the project scope review. Use current design details to assign the work; the course example does not replace a project requirement.
Related reading
Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.