AGC NYS 2026 public-work workshops: build a bid-risk question plan
Prepare an AGC NYS public-work workshop plan that connects bid assumptions to contract documents, accountable reviewers, verification and estimate treatment.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
Select AGC NYS public-work workshops against gaps in a live bid assumption register. The useful outcome is a question, a document to verify and a named reviewer for each material carry. A workshop answer should not silently replace the solicitation or company counsel's review.
This independent Piper guide was checked November 15, 2026. AGC NYS lists its conference December 8–10, 2026 in Saratoga Springs. The advertised program includes DBE bid requirements, prevailing wage, capital programs and delay, time-extension and liquidated-damages topics. Check the organizer's registration and current schedule. The program establishes session topics, not the legal rules for a particular project.
Bring the actual assumption register
Use a current pursuit or a permitted, anonymized example. Identify its agency, contract and document version before assigning a question. If there is no applicable solicitation yet, mark applicability unknown and treat the row as a question for later, not an estimate requirement.
| Issue and applicability | Question to take | Document to verify | Reviewer and estimate treatment |
|---|---|---|---|
| Participation, agency and contract unknown | What project-specific instructions should the bid team locate? | Issued solicitation and amendments | Bid lead; retain an open assumption until verified |
| Wage, applicable schedule unknown | Which issued schedule and classifications should be checked? | Project wage documents and contract | Labor estimator with counsel as needed; document basis of labor carry |
| Time risk, contract unknown | How does this contract address delay and extension requests? | Contract clauses and schedule requirements | Commercial lead and scheduler; record schedule assumption and unresolved exposure |
| Liquidated damages, project unknown | What must be reviewed before a price or contingency decision? | Issued contract and addenda | Commercial lead and counsel; document decision, not an invented rate |
| Capital program outlook | Is this a general program discussion or an issued opportunity? | Agency procurement notice and project documents | Pursuit lead; do not price from the discussion alone |
These are questions and proposed controls, not a statement that any requirement applies to a given project. Check jurisdiction and project applicability before adopting any workshop example.
Preserve what the answer actually establishes
Record the workshop, speaker, date, question and whether the answer concerned a particular agency or hypothetical. Then record the relevant issued document, version, clause and reviewer disposition separately. If the answer conflicts with the bid documents, escalate through the project's authorized clarification channel. Counsel and the bid team determine how the applicable terms affect the bid.
For team allocation use the AGC conference guide. The New York Build public-project questions focus on owner interfaces rather than this bid-risk register. Public bid leveling documentation shows why the reason for an adjustment belongs alongside the number.
For a New York City pursuit, the NYC prevailing-wage and PLA review provides a separate local checklist; do not assume its city or project-specific PLA conditions apply statewide. Keep performance and payment bonds in a separate bid-document check rather than treating the workshop register as proof of complete submission.
For agency outlooks before a solicitation exists, compare the ACEC agency-panel plan. Its pursuit record belongs before this contract-specific assumption register, so a possible program is not mistaken for an issued bid.
Connect a verified assumption to the final review
Piper Final Bid Review connects the estimate, project requirements, scopes and proposals for source-linked findings. The GC retains the decisions. A reviewer can use the register to investigate a source-linked discrepancy, then document whether the carry changes and who approved it.
Related reading
NYC prevailing wage and PLA review: preserve the labor basis behind the bid
For NYC public-work bids, connect labor classifications, supplements and project shift terms to the actual sequence. A review method, not a wage calculator.

Public bid leveling: the file is the evidence
Prepare a source-backed leveling file before a sealed public bid. Keep scope coverage, bid compliance and permitted post-opening procedures distinct under the governing rules.

Performance bonds, payment bonds and bid bonds: review the obligation before the bid
Bid, payment and performance bonds serve different purposes. A GC review for matching bond forms, project obligations, surety capacity and the estimate basis.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.