Border Street: separate private-property flood barriers and Harborwalk choices
Compare Border Street flood and Harborwalk strategies property by property, with working-waterfront access and engineering still explicit.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
Estimate Border Street property by property and keep the seawall-only and connected Harborwalk approaches distinct. A district-wide flood-protection objective does not establish one uniform wall or permission to build across private land.
The following register is an estimator's interpretation of the cited public records, not a contract scope or a substitute for the current procurement documents.
Map flood strategy and access by private property
| Work or location | Public record | Estimator's review |
|---|---|---|
| Each private property | Seven sites with different uses and waterfront structures | Record owner, access constraints, condition and proposed strategy. |
| Seawall repair and elevation | Concept retains existing Harborwalk without new connections | Separate structural repair from elevation and temporary access. |
| Harborwalk connection | Alternative could add access on or behind improved seawalls | Identify route, support, agreements and operational interfaces. |
| Berm and deployable barrier | Concept strategies may suit different site uses | Confirm footprint and marine operations before selection. |
| Designated Port Area | Working-waterfront uses constrain design | Verify applicable approvals and property arrangements. |
Keep geotechnical progress separate from final permissions
The January 2025 executive summary says most waterfront structures need integrity improvements or replacement as a foundation for future work. It presents elevated seawalls, berms, an elevated Harborwalk and deployable gates as possible strategies. It does not select one design for every property or establish final barrier elevations.
The October 2026 City timeline reports borings in winter and spring 2026, geotechnical report production in summer, and advanced design and property engagement in fall. The reviewed executive summary and hub do not establish the report’s conclusions, final property agreements or permits. The earlier spring 2025 30% design date was a forecast.
The primary records are EXECUTIVE SUMMARY - ENGLISH official primary document Resilient Border Street Waterfront Project live official body.
Obtain property agreements and current engineering
For each property, keep separate lines for structural rehabilitation, flood barrier, public access, marine-use continuity and temporary work. Note the assumed method and interface at both property boundaries. Request the full current engineering and geotechnical reports, surveys, owner agreements, regulatory determinations and issued design before assigning quantities or choosing a construction method.
Before relying on a public presentation, trace the official Boston project record and check the controlling issued revision.
Related reading
Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.