Boston flood reviews: distinguish FEMA flood standards from Article 25A resilience

Use separate maps and design decisions for Boston flood-hazard and coastal-resilience reviews before pricing elevations and closeout evidence.

Guide1 min read

Published

Construction scaffolding interior

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo

A Boston estimator should ask the design team for two separate flood-review decisions before carrying utility elevations or enclosure details. The FEMA-based Article 25 Flood Hazard District and the Article 25A Coastal Flood Resilience Overlay District have different bases; a result on one map does not settle the other.

Inspectional Services identifies Article 25 with FEMA's Special Flood Hazard Area and distinguishes the Planning Department's overlay. Boston Planning describes Article 25A's future coastal flood mapping and design elevations. The designer and authorities must establish which provisions apply to this project.

Keep map, datum and evidence in one bid record

DecisionResponsible evidencePricing or handoff effect
Article 25FEMA map version and district determinationIdentify flood review and permit documentation
Article 25AOverlay map and resilience design basisCheck separate elevation and design implications
Existing workDesigner's substantial improvement or damage assessment and valuation basisAvoid assuming a limited alteration avoids current standards
DetailsDesign elevations and datum, utility and enclosure details, tests and certificationsAssign trades and detail gaps before leveling
CloseoutAs-built flood certificate and responsible design professionalCarry survey and documentation through occupancy

The City describes substantial improvement or damage in relation to improvement or repair cost exceeding 50% of building market value. The designer and authority should determine the applicable valuation, freeboard and standards. Do not calculate a compliance outcome from a preliminary trade total. If the elevation basis changes, revisit equipment supports, penetrations, enclosure work and survey responsibility together.

At bid handoff, show each unresolved map or datum decision, the person who must answer it and the affected allowance or milestone. The code-basis review helps trace the resulting requirements, while the Boston decision guide identifies other independent reviews.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.