Boston permanent drainage: reconcile infiltration, UIC and maintenance scope
Level Boston permanent drainage bids using the engineer’s infiltration basis, UIC decision, maintenance responsibilities and as-built records.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 1 min
- Published
For a Boston site subject to BWSC’s permanent stormwater requirements, compare civil bids against the engineer’s approved infiltration design and its evidence requirements. Do not use a rainfall factor alone as a construction design or assume every renovation needs the same site-plan approval.
BWSC’s storm drain requirements describe a criterion of one inch of rainfall times impervious area for projects below 100,000 square feet of floor area, and 1.25 inches at or above 100,000 square feet. Floor area selects the criterion; the impervious area is the surface used in the calculation. The engineer must determine applicability and prepare the project-specific analysis.
Civil scope and evidence checklist
| Item | Project input to obtain | Bid and handover question |
|---|---|---|
| Design basis | Floor area, impervious catchment and drainage analysis | Are all contributing surfaces and connections included? |
| Subsurface | Soil infiltration testing and engineer’s assumptions | Who pays for testing and changes if conditions differ? |
| Infiltration system | Approved location, excavation, media and protection | Who installs and protects it during construction? |
| UIC | Determine whether the new system requires an approval number | Who obtains and supplies the number to BWSC? |
| Operations | O&M plan and assigned maintenance responsibility | Are access and turnover documents included? |
| As-built | Green infrastructure documentation and survey | Which contractor collects records before concealment? |
BWSC describes testing, drainage analysis, O&M and as-built green-infrastructure documentation, and requires UIC approval numbers for applicable new infiltration systems. It also states that GCOD infiltration systems may not use underdrains or stormwater capture and reuse. BWSC requirements
Resolve construction interfaces before leveling
For an illustrative underground chamber, compare excavation limits, bedding, connection elevations, protection from construction sediment and survey responsibilities across civil and plumbing bids. A low installation price can leave testing or reinstatement unassigned. Reconcile plumbing and site utilities, and keep permanent drainage separate from temporary SWPPP and dewatering decisions in the Boston obligation guide.
Related reading
The five-foot line: plumbing and site utilities
Review plumbing and site-utility endpoints, connections, excavation and fees against actual project requirements before assigning scope or carrying a price.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.