Second Avenue Subway Phase 2 Fit-Out: Contract C26204 Guide
Review Second Avenue Subway Phase 2 fit-out; review station, systems and prior-contract interfaces and verify current procurement documents before pricing.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The MTA overview describes the fourth and final Second Avenue Subway Phase 2 contract, with station and tunnel fit-out at 106th, 116th and 125th Streets, entrances and ancillary buildings, track, traction power, communications, signals and testing. The overview extends CBTC work across Phase 1 and Phase 2. The official solicitation notice is the source for this description.
Research checked November 15, 2026 using supplied agency snapshots. This is independent Piper analysis, not an agency notice or affiliation. Confirm current status before acting.
Procurement stage and dates
Both listing and September 8 notice record November 10 for the first-stage solicitation, elapsed by the research date. The notice describes a two-step process in which only shortlisted respondents proceed to the RFP; it does not establish an award. The November 13 MTA listing snapshot records an estimated value of $100M+, a term of 52 months, and 2 addenda. These are snapshot fields, not a contract price or proof of current availability. Check the agency source and obtain the complete current solicitation and every addendum. Reconcile the deadline, eligibility and document baseline to the controlling material, rather than relying on an older notice or this guide.
What the scope boundary means for the estimate
The project overview repeatedly uses C26204, but the notice narrative also says C26024. Confirm the identifier against the issued RFQ before pursuing. The package interface with earlier station and tunnel shell contracts is central to scope allocation.
Record each interface against its drawing or specification, the responsible trade and estimate line. Leave an unresolved boundary open until the issued documents or a clarification establish it.
Project-specific documents and questions
Obtain the solicitation instructions, drawings, specifications, project overview, available existing-condition information and all revisions. Assign an owner to answer these questions against that baseline:
- What work and existing-condition information is handed over from the earlier shell contracts?
- Where do station fit-out, systems, track and commissioning responsibilities meet?
- What are the boundaries and acceptance interfaces for the CBTC work across both phases?
For each answer, record the controlling sheet or clause, responsible trade, estimate treatment and the owner of the remaining decision. Reissue affected inquiries when an addendum changes that basis.
Keep the review tied to the issued package
Use the NYC public bid review checklist, addenda management for estimators, rail and airport prebid access review to structure the review. The NYC public project guides provide a directory of related packages.
For an issued document set, Piper scope generation can help prepare a scope for review; check the resulting references and trade assignments against the current package.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

NYC rail construction bids: verify operator access and protection before pricing
For MTA-related construction, access assumptions can change scope and duration. Review the issued contract, operator interfaces, protection and price basis.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.