Queensboro Plaza to 33rd Street Structural Repairs: C35310 Guide
Explore Queensboro Plaza to 33rd Street structure painting and repairs; review scope and access and verify current procurement documents before pricing.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
The IFB overview calls for abrasive blasting and painting elevated structures, structural-member repair and replacement, wayside-building exterior painting and exterior component and fenestration repairs, and demolition of one signal tower. The official solicitation notice is the source for this description.
Research checked November 15, 2026 using supplied agency snapshots. This is independent Piper analysis, not an agency notice or affiliation. Confirm current status before acting.
Procurement stage and dates
The November 13 listing records November 17 as the due date and shows the contract number as N/A; the September 18 notice identifies SSE C35310 and October 27. The notice calls it A + B bidding. The November 13 MTA listing snapshot records an estimated value of $50M - $100M, a term of 1,284 Calendar Days, and 5 addenda. These are snapshot fields, not a contract price or proof of current availability. Check the agency source and obtain the complete current solicitation and every addendum. Reconcile the deadline, eligibility and document baseline to the controlling material, rather than relying on an older notice or this guide.
What the scope boundary means for the estimate
The painting package has structural, building-envelope and demolition boundaries. Ask for a breakdown that identifies each rather than treating the project as a single coating quantity.
Record each interface against its drawing or specification, the responsible trade and estimate line. Leave an unresolved boundary open until the issued documents or a clarification establish it.
Project-specific documents and questions
Obtain the solicitation instructions, drawings, specifications, project overview, available existing-condition information and all revisions. Assign an owner to answer these questions against that baseline:
- Which structural members are designated for repair or replacement and what condition information supports the takeoff?
- What is included in wayside-building exterior repairs and fenestrations?
- How are the signal tower demolition and the painting-to-steel repair interfaces allocated?
For each answer, record the controlling sheet or clause, responsible trade, estimate treatment and the owner of the remaining decision. Reissue affected inquiries when an addendum changes that basis.
Keep the review tied to the issued package
Use the NYC public bid review checklist, addenda management for estimators, rail and airport prebid access review to structure the review. The NYC public project guides provide a directory of related packages.
For an issued document set, Piper scope generation can help prepare a scope for review; check the resulting references and trade assignments against the current package.
Compare the repair limits and painting interfaces across the two elevated-structure packages; each has its own locations and issued scope. See the Manhattan elevated Broadway-Seventh Avenue repairs guide.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction addenda management for GC estimators
Addenda are official bid-document revisions. Log them, distribute them, retakeoff the deltas, and require subcontractor acknowledgments so your estimate and every bid reflect the final scope.

NYC rail construction bids: verify operator access and protection before pricing
For MTA-related construction, access assumptions can change scope and duration. Review the issued contract, operator interfaces, protection and price basis.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.