Citywide Indoor Pool Filter Plant Reconstruction: project status and contractor scope review
Citywide Indoor Pool Filter Plant Reconstruction spans Manhattan and Brooklyn. Compare the two locations and verify the current procurement before pricing.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
NYC Parks describes pool filter plant reconstruction across the listed locations at East 54th Street between 1st and 2nd Avenues and 261 Bedford Avenue, Manhattan and Brooklyn. Tracker ID 10319, FMS 846 P-2MTFLTR, was in procurement in the record last updated November 13, 2026. For a GC, the pursuit decision depends on the actual issued scope and whether a solicitation is available, not the tracker phase alone. NYC Parks tracker record.
Recorded project status
The record reports design 100% complete, procurement 85% complete and construction 0% complete. These are separate phase measures. Project funding is recorded as between $3 million and $5 million; that is a funding band, not a bid price or contract award. Design actually completed August 1, 2023; the original design projection was June 1, 2023. Procurement began September 1, 2025 and its recorded projected completion was September 1, 2026. That forecast had passed by the research date; the current schedule is unknown and the record does not establish completion. The construction start field is January 1, 2027 and projected construction completion is January 1, 2028; the start field alone does not establish that work began. Source: NYC Parks tracker; see also the dataset and data dictionary.
Two pool plant locations
Make a location-by-location scope matrix before requesting prices. The two tracker rows identify East 54th Street and 261 Bedford Avenue, but do not say which equipment is included at each plant. Check the issued equipment schedules and drawings for each location, and reconcile any differences in removal and replacement scope. Do not assume identical plant packages or count the repeated funding twice.
This is an estimating review question, not a statement that any particular item is required. Obtain the drawings, specifications and addenda before assigning scope or settling a bid/no-bid decision. Use the NYC public bid review to record unanswered questions and the responsible reviewer.
Check the current procurement documents
Search the City's Procurement Navigator using the project name and identifiers, and confirm any match with the issuing agency. The City says public opportunities can be searched without a PASSPort account. Check the current solicitation, status, due date and all addenda directly; the tracker snapshot does not establish an open bid. The NYC public project directory provides context for other named packages.
Compare the plant scopes
Once the team has the project documents, Piper's scope-generation workflow can support a document-based scope review. Compare the resulting scope with the issued documents and subcontractor qualifications; resolve open boundaries before carrying a price. See the construction scope review guide.
Research checked November 15, 2026. This is independent Piper analysis, not an NYC Parks notice or agency affiliation.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.