Concrete formwork and reshoring: price the temporary system through the next load

Test formwork rental and stripping assumptions against placement, removal evidence, reshoring and the next load.

Guide3 min read

Published

Construction scaffolding interior

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Map the pour and the next load
  2. Reconcile drawings, inspections and scope
  3. Build a cycle map that exposes the carry
  4. Price retention and revisit changes

A concrete bid with a short formwork rental period is only comparable if the proposed reuse cycle matches the actual placement sequence and the time the supported structure must carry subsequent loads. A GC estimator should map each pour through removal evidence and reshoring release, then price the equipment, labor and time that remain. A desired cycle alone is not evidence that forms can be stripped.

This review does not design temporary works or authorize removal. The responsible designer, contractor and project team determine the applicable system and evidence under the issued documents and governing requirements.

Map the pour and the next load

Start with each placement area, planned date, support location and the next activity that adds load. Record when the proposal assumes the forms and shores move, where they go next, and what remains behind. Include changes in sequence and any competing use of the same equipment.

In an illustrative two-floor cycle, a bidder assumes that all shores leave the lower floor when the next pour begins. The schedule also places new concrete and stored material above that floor. Ask the responsible temporary-works designer and concrete team what support and evidence the proposed sequence requires. If the same shore inventory is needed in two places at once, the bid needs a revised sequence, additional equipment or a clearly identified unresolved cost.

Reconcile drawings, inspections and scope

OSHA 1926.703 addresses the capacity of formwork for reasonably anticipated loads and requires applicable drawings or plans, including revisions, to be available at the jobsite. It also specifies inspection of shoring equipment before erection and of erected shoring immediately before, during and immediately after concrete placement. These are distinct work and document interfaces to assign in the estimate.

Ask who supplies the system design and layout, updates revisions when the sequence changes, supplies and inspects equipment, and provides labor for installation, adjustment and removal. Compare the concrete and rental proposals with the GC's general conditions. A rental quote can provide equipment without pricing the design, handling or retention assumed elsewhere.

Build a cycle map that exposes the carry

Cycle pointEvidence or decision neededEstimate question
Design and layoutCurrent drawings revisions and sequence basisWho provides engineering updates and coordination
Equipment before placementSpecified equipment and inspection responsibilityWho carries rental delivery handling and inspection
Placement and next loadPlanned placement dates and later loadsDoes the same inventory serve overlapping areas
Forms and shoresStipulated removal conditions or qualifying test evidence as applicableWho obtains evidence and what duration is priced
ReshoringSupport period and release basis from responsible partiesHow many sets remain for how long and who removes them

Under 1926.703(e), with the stated exceptions, removal of forms and shores depends on the employer's determination of sufficient strength based on stipulated conditions being followed or the specified testing basis. The rule separately addresses when reshoring may be removed. It also addresses erecting reshoring as original support is removed when required by the load condition. These provisions are not a universal number of cure days.

Price retention and revisit changes

Level bidders against the same start, end and reuse assumptions. Separate the base carry from an allowance or exclusion for unresolved duration; identify the quantity and rental or labor basis rather than hiding the exposure in a single cycle label. Ask who pays for additional equipment and handling if the sequence changes under the contract, without assuming that the contract assigns it to a particular party.

Transfer open evidence, system revisions and the anticipated next load to the project team at buyout. Revisit the estimate when the pour sequence changes. Use the broader safety scope review for shared responsibilities and access and sequence review for storage and equipment moves.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow