Temporary construction heat: price the operating period and the system handoff

Build a temporary heat carry around the work period, energy, operating services and any permanent-equipment handoff.

Guide2 min read

Published

Construction scaffolding interior

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.

Book a demo
On this page
  1. Define the phase before pricing the equipment
  2. Test the operating period
  3. Get approval for permanent-equipment use

A heater rental is only one part of a temporary heat carry. For a GC estimator, price the period and service needed for each phase, including energy, installation, operation and eventual removal or restoration. The basis must state what enclosure and utility readiness the price assumes.

Define the phase before pricing the equipment

Tie each heat duty to the work requiring it, the space, assumed start and finish, enclosure status and the party approving the system choice. A delay to enclosure can change the basis even if the calendar dates do not move. Connect temporary heat to phase and utility readiness before applying a weekly rate.

Cost basisQuestions for the estimate
ReadinessWhat enclosure and access are assumed at the start?
System and serviceWho selects and approves equipment and provides qualified installation and operation?
UtilitiesWho supplies and pays for electrical support or fuel and replenishment?
SafetyWho owns the project-specific ventilation and safety plan?
CloseoutWho removes temporary equipment and restores or cleans the affected system?
Permanent equipmentIs early use approved and what are the filter, cleaning and warranty consequences?

OSHA's temporary heating device rule addresses ventilation and device constraints. Qualified project personnel must plan the actual installation and operation; a bid worksheet does not select or size a system.

Test the operating period

For a fictional sensitivity, assume a service rate of $5,000 per week that includes the same defined equipment and operating scope throughout. Eight weeks is $40,000; twelve weeks is $60,000. The four-week extension adds $20,000 under that assumption. This is neither a supplier quote nor a weather forecast. If fuel, mobilization or cleaning are outside the weekly rate, show them separately and do not extrapolate them automatically.

Get approval for permanent-equipment use

The AIA-MBA temporary-services recommendations, reviewed in 2010, distinguish enclosure stages and discuss fuel, labor, power, filters, cleaning and warranty timing. These regional recommendations are questions to check against the actual agreement, not a universal payment rule. Before assuming permanent equipment will provide temporary heat, obtain the required written project and manufacturer approvals, identify any cleaning and filter replacement, and record the warranty start consequences. Assign unresolved approval and cost to an owner before finalizing the carry.

ShareLinkedInX

Related reading

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow

See Piper on your project

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.