CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement: scope and procurement guide
Baruch College Field Building renovation: review DASNY’s qualification stage, Student Life fit-out, cooling upgrades and preliminary sequencing assumptions.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
DASNY project 389050 at Baruch College, 17 Lexington Avenue, New York, combines sixth- and seventh-floor shell fit-out for Student Life with cellar and rooftop cooling plant upgrades. The solicitation title also identifies asbestos and hazardous-material abatement. For preconstruction, the key issue is how abatement, fit-out and the two plant locations sequence together. DASNY official opportunity: CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Baruch Field Building EOI and design status
The November 3, 2026 notice is an EOI, not a priced bid; it listed responses due December 1 at 2 p.m. It describes design development at 60%, issued September 18, and bid drawings scheduled for November 20. DASNY expressly says its posted drawings and specifications are reference material, not 100% construction or bid documents. Qualified firms are to receive final documents and invitations to bid.
Sources for this project: DASNY official opportunity: CUNY Baruch College Field Building Renovation with Asbestos and HAZMAT Abatement.
Cooling plant rigging and fit-out sequence
The notice reports a $16.5 million to $20 million construction estimate and assumes ten months of straight construction, contingent on actual sequencing and lead times. These are planning assumptions, not an award price or guaranteed duration. The design team assumes a crane for rooftop elements and fit-out HVAC units and cellar rigging through the areaway between the three Baruch buildings. Verify crane access, rigging openings, equipment dimensions and responsibility for restoration against the final package.
Qualification requirements and bid documents
For the EOI, assemble five years of similar experience, five relevant projects from the last ten years and three sample schedules, plus the remaining requested safety, staffing, subcontractor, workload, insurance, bonding and vendor responsibility materials. The project PLA applies as described in the notice. Anticipated EEO and M/WBE goals are subject to the owner’s final determination. Ask how abatement release, roof work and plant outages govern access to the fit-out floors before using the ten-month assumption in a pursuit schedule.
Turn the issued scope into a trade review
Once the team has the issued documents, use the construction scope review guide to assign inclusions, exclusions and unresolved interfaces. The NYC public bid review checklist helps check notice obligations separately. Compare the named package with the NYC public project directory before reusing assumptions from another job.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.