CUNY College of Staten Island Buildings 1L, 1R, 6S, 2A LED Upgrade: scope and procurement guide
College of Staten Island LED upgrade: review the four-building lamp conversion, emergency lighting, DASNY qualifications and project labor requirements.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 2 min
- Published
On this page
At the College of Staten Island, 2800 Victory Boulevard, DASNY project 384270 / C2236 calls for removing fluorescent lamps and ballasts and installing direct-wire LED lamps in existing fixtures in Buildings 1L, 1R, 2A and 6S. Emergency lighting must be maintained, while various Building 1L lobby fixtures remain unchanged. DASNY official opportunity: CUNY College of Staten Island Buildings 1L, 1R, 6S, 2A LED Upgrade
This is independent Piper analysis, not an agency notice. Source information was checked November 15, 2026; verify the current agency documents before acting.
Staten Island LED bid and notice dates
This is a general construction bid, not a professional-services solicitation. The November 9, 2026 notice listed bids due December 17 at 2 p.m. and a strongly encouraged pre-bid meeting on November 24 at 10 a.m. DASNY estimated construction at $3.2 million to $3.7 million. These are notice figures, not an award or a promise that the deadline remains unchanged.
Sources for this project: DASNY official opportunity: CUNY College of Staten Island Buildings 1L, 1R, 6S, 2A LED Upgrade.
Fixture conversion and emergency lighting
Build the takeoff by building and fixture type, separating the excluded 1L lobby fixtures from the direct-wire conversions. Reconcile fixture access, lamp and ballast removal, wiring modifications and disposal responsibilities against the actual specifications. Ask who maintains emergency illumination during each work area turnover and how the sequence is verified. Carry access and testing only to the extent supported by the documents and trade quotes.
Bid qualifications and labor terms
The notice requires the successful low bidder to execute the project PLA and all subcontractor tiers to be bound. It calls for five years of similar experience and five comparable contracts completed or substantially completed in the last ten years. Review the minimum qualifications form and the February 4, 2026 general conditions. DASNY says documents obtained through its designated planroom establish official planholder status; check addenda and current instructions there.
Turn the issued scope into a trade review
Once the team has the issued documents, use the construction scope review guide to assign inclusions, exclusions and unresolved interfaces. The NYC public bid review checklist helps check notice obligations separately. Compare the named package with the NYC public project directory before reusing assumptions from another job.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.