Lehman College tunnel and courtyard waterproofing: scope and EOI guide
Lehman College courtyard waterproofing and tunnel joints: review the DASNY expression of interest, reference plans, labor terms and key scope interfaces.
Author
Ido Gedanken, CEOPublished

Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.
Book a demo- Type
- Guide
- Read
- 4 min
- Published
On this page
DASNY solicitation 349310 covers courtyard waterproofing and tunnel foundation-wall and expansion-joint work at Lehman College, 250 Bedford Park Boulevard West in the Bronx. The immediate decision for a GC is whether to submit a qualification package: the official notice is an expression of interest (EOI), not an invitation to submit a priced construction bid. The notice was issued November 13, 2026 and lists a December 4, 2026, 2:00 p.m. proposal deadline. Check the live notice for changes.
This is independent Piper analysis of the notice checked November 15, 2026, not a DASNY notice. The agency classifies the opportunity as a construction contract; it is not a solicitation for professional design services.
Courtyard and tunnel work meet at restoration boundaries
The notice describes removal and replacement of courtyard waterproofing membrane and flashings, new wearing surfaces, masonry unit removal and replacement for flashing installation, and removal and reinstallation of guardrails. Existing plaza drains are to be replaced in kind on existing roughing. It also describes excavation, removal and replacement of waterproofing on tunnel foundation walls, injection waterproofing on those walls, waterproofing existing tunnel expansion joints, and removal and reinstallation of existing stone steps. DASNY's opportunity notice is the source for these scope items.
For estimating, the junction of membrane, flashing, masonry and the new wearing surface is a package boundary worth mapping, as is the connection between excavation, wall waterproofing and reinstatement. The notice does not establish quantities, exact details or all limits. A useful first scope sheet would list each interface, the relevant drawing detail when available, a responsible trade and any unanswered transition question. Do not treat a missing detail as an exclusion without checking the eventual bid documents.
Qualification comes before a priced bid
DASNY says the posted drawings and specifications are reference only, not 100% construction or bid documents. It plans to distribute finalized documents to qualified contractors invited to bid after evaluation of EOI packages. The opportunity page provides access to the reference manual and drawings. An estimate from these materials can inform pursuit planning, but should be identified as preliminary and reconciled to the eventual issued bid set.
The notice asks for a tabbed EOI package. Its experience section calls for at least five years of similar experience and details of five relevant projects completed or substantially completed in the last ten years; it also requests three sample schedules for projects listed in the experience section. Other tabs cover company profile, safety, proposed team, potential subcontractors, workload, experience modification rating, bonding capacity and vendor responsibility. DASNY states that tabs 1 through 7 will be scored, and firms deemed qualified will be shortlisted for a future bid invitation. Read the notice for the complete submission requirements and confirmation of receipt provisions.
Price and project labor assumptions need the final documents
The notice states an estimated cost range of $2.2 million to $2.8 million. This is DASNY's stated estimate, not an award or a contractor's price. The notice says the successful low bidder must execute the project labor agreement (PLA) as a condition of award, and subcontractors at every tier must execute the specified letter of assent. Review the actual PLA and contract documents for this project before setting labor and subcontract assumptions.
The notice lists anticipated goals of 18% MBE, 12% WBE, 6% service-disabled veteran-owned business participation, and 45% minority and women workforce participation. It says the owner will determine EEO and M/WBE goals when finalized construction and bid documents are distributed. These are notice-specific statements, not general requirements for other projects.
Questions to carry from EOI to estimate
These are estimating investigations, not confirmed additional work:
- Where do the courtyard membrane and flashing details terminate at masonry, guardrail penetrations and new wearing surfaces, and which trade carries each transition?
- What are the excavation, wall membrane, injection and expansion-joint limits, and how do the wall and joint treatments connect?
- What quantities and protection or reinstatement details apply to the existing stone steps and plaza drains on existing roughing?
- What changed between the reference documents and the final invitation set, including the PLA, participation goals and bid form?
Assign these questions in a scope sheet and reconcile them to subcontractor quotations only after the controlling documents are available. The public bid review checklist and construction scope review guide support that document-by-document process. The public project directory covers other named projects.
Related reading
NYC public construction bid review: connect the requirement to the number
A NYC public-bid review should trace owner requirements into scope, quotes, schedule and the final number. A practical review map for small GC precon teams.

Construction scope generation: a practical guide for GCs
How general contractors turn drawings, specifications, addenda, and company standards into trade scopes a subcontractor can price, an estimator can trace, and a senior reviewer can challenge.

Piper removes manual review from the critical path and brings project data, company knowledge, and expert checks into every preconstruction decision and workflow
See Piper on your project
Bring a current or completed project and see how Piper saves review time, surfaces scope gaps, and applies your company's knowledge.